| Commissioning
Bosch Rexroth AB, RE 15409 Version 08.2022,
8
Commissioning
8.1
Commissioning
Make sure to have read and understood this manual in its entirety, as well as the
additional attached technical documentation.
Check the following points before commissioning the S-Link Monitoring Unit, i.e.
before starting the first time:
f
Make sure that all cables are connected in accordance to
Monitoring Unit to the control unit.
f
Visually examine the box and all cables for damages or faults.
f
Confirm that the box is mounted properly.
8.2
Update software of Hägglunds Spider 2
Connect a 9-pole Null modem serial cable between the Spider control unit main
card serial port, see
Fig. 62: Main card serial port
, and the laptop Com port. A USB-
serial port adapter may be needed.
Check in Windows Device Manager which Com port that is assigned for the serial ad-
apter if used, see
Serial port
Main card
P25
Fig. 62: Main card serial port
Fig. 63: Com port assignment
DD00078711
DD00078712