Installation, handling and maintenance
Technical changes reserved
79
7.3.8
Fitting tap-off units to plug-in (125 - 630 A)
The installation of units for plug-in is only possible on straight busbar elements
with plug-in.
-
These tap-off units can be installed without switching off the busbar trunking
run. The measures for live working according to EN 50110 (VDE 0105-1) and
national regulations and standards must be observed for this (national
regulations may also prohibit live assembly).
-
The tap-off units are plugged onto the plug-in and clamped to the straight
busbar element.
-
Due to the large connection compartment, the maximum rated current is
restricted according to the number of plug-in on the busbar elements
-
to a maximum of 250 A for 3 plug-in,
-
to 630 A for 2 plug-in,
Step
Action
1
Open the cover of the tap-off unit.
Result: Screw B is accessible.
2
Turn screw B until screws C have moved from position 2 to
position 1 and the front clamps have opened.
3
Turn screw D until the rear clamps have opened.
4
Place the tap-off unit on the plug-in provided on the straight busbar
element.
Summary of Contents for Unibar H 800 A
Page 1: ...Busbar system unibar H System manual 800 A to 4000 A...
Page 10: ...Construction and characteristics 10 Technical changes reserved...
Page 19: ...Construction and characteristics Technical changes reserved 19 Notices...
Page 40: ...Product selection 40 Technical changes reserved Copper...