4
Hager Electro Pty. Ltd. - Unit 17/2-8 South St, Rydalmere NSW 2116 - hager.com/au
Turn 90 degree of lock 1 and 4
Remove the bolt in position 6 and 10
Escutcheon removal
Mounting a safety pole filler
90
o
2.6 N·m x2
1.
2.
Page 1: ...ergisation Final overview prior to Energisation Review alignment of all devices and ensure there has been no damage during final terminations The panelboard is to be cleaned and vacuumed from filings...
Page 2: ...screws in position 13 Remove the hinge pin in position 7 8 9 Remove the rubber seal in position 2 3 5 Rotate the rod in 90o Remove the door Changing the door s opening orientation 1 1 4 7 10 2 5 8 11...
Page 3: ...ll the handle screws in position 13 Remove the rubber caps in position 2 3 5 Install the hinge bolt in position 2 3 5 Install the cranes 13 16 19 14 17 20 15 18 21 6 6 N m x4 x2 x3 x6 Refer to indicat...
Page 4: ...Electro Pty Ltd Unit 17 2 8 South St Rydalmere NSW 2116 hager com au Turn 90 degree of lock 1 and 4 Remove the bolt in position 6 and 10 Escutcheon removal Mounting a safety pole filler 90o 2 6 N m x2...