HADEF EEE Installation, Operating And Maintenance Instructions Download Page 10

 

10 

 

ƒ

 

ƒ

 

ƒ

 

ƒ

 

Pos: 10.3.2 /1_HADEF/6-

 

6.2

Th
cra
ins

ƒ

 

ƒ

 

ƒ

 

Pos: 10.3.3 /1_HADEF/6-

 

6.3

Sc

ƒ

 

ƒ

 

ƒ

 

Pos: 10.3.4 /1_HADEF/6-

 

 

A  
B  

 

1. 

 

2. 
3. 
4.  

 

Prepare cra
transport wi
Set the cran
are resting o
beam. 
The wheel f
wheels mus
crane rail - d
For motor-d
must effect 
according to

-MONTAGE/Krane/EEE+EHH+EDD/2 teilmontierter Kran @ 2\mod_1287497702640_52.docx @ 16406 @  @ 1 

2 Asse

e crane is, a

anes. Before

structions for

Install the h
instructions
Assemble m
the wiring d
Proceed as
complete cr

-MONTAGE/Krane/EEE+EHH+EDD/3 Adapterkran @ 2\mod_1288086108867_52.docx @ 16576 @  @ 1 

3 Asse

cope of suppl

1 set end ca
1 set adapte
fastening de
1 set welda

-MONTAGE/Krane/EEE+EHH+EDD/4 Adapter A+B+C @ 2\mod_1288087442675_52.docx @ 16579 @  @ 1 

 Fastening s
 Adapter / ad

Ve

Bore the ho
beam accor
for holes 

Assemble th
Secure them

Check screw

 

 

ane for prope

ith the lorry m

ne down so t

on the crane

flanges of the

st be placed 

do not jam. 

driven cranes

electric or pn

o the rules a

embly - par

apart from th

e positioning

r the hoist. M

oist accordin

motor-driven 

iagram. 

sembly a me

rane. 

embly - Ad

ly: 

arriages 

ers with scre

evices, altern

ble adapters

screws - tight

dapter plates

ersion A 

oles into the m

rding to the t

he end carria

m with safety

w connection

 

er and safe 

mounted cran

that the whee

e rail of the cr

e running 

correctly on 

s the custom

neumatic wir

nd regulation

rtially asse

he hoist, fully

g the crane

Motor-driven c

ng to its oper

cranes acco

entioned befo

apter Cran

ew fittings inc

natively 

tening mome

 

main 

emplate 

1

ages to the m

y nuts 

ns

 

 

ne. 

els 

rane 

the 

er 

ring 
ns. 

 

Il

embled cra

y assembled 

e, the hoist 

cranes must 

rating 

ording to 

ore for the 

nes 

cluding 

ents acc. to t

V

. Bore the h

beam acco
template f

main beam u

llustration 5

nes 

and installed

must be m

be installed 

 

Illustr

 

Illustr

the table 

Version B 

holes into the

ording to the

for holes 

sing the fast

 

d, incl. powe

mounted in 

in accordanc

ration 6 

ration 7 

e main 

1

tening screw

er supply for 

accordance

ce with the a

V

. Weld the a

main beam

5.52.707

electric or p

e with the o

appropriate d

Version C 

adapter plate

.00.01.02

neumatic 

operating 

diagram.  

 

 

es to the 

Summary of Contents for EEE

Page 1: ...Single Girder Electric Overhead Travelling Crane Type EEE Pos 1 4 1_HADEF TITELSEITE Bauarten auch als Adapterkran 2 mod_1288102918176_52 docx 16586 1 also available as adapter crane Pos 1 5 1_HADEF T...

Page 2: ...ww hadef com Subject to changes Pos 4 1_HADEF ALLGEMEIN Allgemein 4 Inhaltsverzeichnis Inhaltsverzeichnis 1 2 0 mod_1171286846268_52 docx 56 1 Table of Contents 1 Information 3 1 1 Indications to dete...

Page 3: ...ertified quality assurance system as per ISO 9001 The production of components at our work is subject to strict intermediate checks After assembly each product is subject to a final test with overload...

Page 4: ...d other useful information Danger from electricity Danger from explosive area Pos 6 2 2 1 1_HADEF 2 SICHERHEIT Allgemein Sorgfaltspflicht des Betreibers 04 Sorgfaltspflicht des Betreibers 0 mod_117205...

Page 5: ...othes that are too big wide Pos 6 3 1_HADEF 2 SICHERHEIT Bestimmungsgem e Verwendung 01 Alle au er 380 2 mod_1300955165911_52 docx 18464 1 2 4 Appropriate use The permitted safe working load of the de...

Page 6: ...the immediate vicinity must be informed by calling to them Please pay attention to the regulations for load carrying devices UVV for both positive and non positive methods of attaching loads The lift...

Page 7: ...Pneuma Cranes acco dard the cran riage version lly Version A le the end ca ageous 2 mod_1288082417896_52 docx 16570 1 Adapter C cranes are s n beam can 2 mod_1290678435939_52 docx 17350 1 carriages ar...

Page 8: ...luding running wheels and travel drive Standard as welded version C As option available with screw fittings version A B Wheels Machined steel wheels with ball bearing and wheel flange Pos 8 3 3 2 1_HA...

Page 9: ...00 4747 4765 250 0 55 5891 10000 6000 1600 5126 5228 250 0 55 1704 9000 1600 5500 5488 250 0 55 2361 11000 1600 5714 6016 250 0 55 2915 12000 2200 5841 6143 315 0 75 3311 14000 2200 6077 6379 315 0 75...

Page 10: ...ng r the hoist M oist accordin motor driven iagram sembly a me rane embly Ad ly arriages ers with scre evices altern ble adapters screws tight dapter plates ersion A oles into the m rding to the t he...

Page 11: ...87534915_52 docx 440 1 ople that are n They mus that the oper g personnel 1 mod_1264760146475_52 docx 11700 1 wn control sw 1287553567138_52 docx 16427 1 t control 6 rgency stop ction switch g slow fa...

Page 12: ...duty cycle i e intermittent operation S4 40 ED as per VDE 0530 means that in a period of 10 minutes the motor can operate no matter the height of the load for 4 minutes It is therefore irrelevant whet...

Page 13: ...ine acc VDE 100 9 2 2 Control connection Control cable with connection plug as standards Plug in for setting in operation Changes at connection cable are only allowed by am expert 9 2 3 Cable connecti...

Page 14: ...y must be effected with utmost care Only qualified persons may do this work Servicing and maintenance work must only be done when the hoist is not loaded Records must be kept of all test results and m...

Page 15: ...devices out of operation and effect a General Overhaul Further use of the equipment is only allowed after a licensed qualified person has proofed that further use is possible without doubt and the co...

Page 16: ...eralyn SF 320 Ca tioned by ord uble ention to the th the equipm unit against arning note in working area d the chapter epair of faults of failures ple 2 1 TION d by wear o c must be r ge ls are life t...

Page 17: ...ace the starter relay Phase failure only direct control Find the cause and repair Motor does not brake or has excessive afterrunning Electric hoists and winches Switching error after intervention in t...

Page 18: ...easures are as above Also read the chapter Transport and storage 17 2 Final decommissioning disposal Measures are as above After disassembly ensure that the disposal of the equipment and any materials...

Reviews: