background image

 

12 

 

F

P

P
W
an

 

B
st
sa
It 
litt
rop
Th
fo

 

F

ƒ

 

ƒ

 

ƒ

 

 

F

ƒ

 

ƒ

 

ƒ

 

 

D
rou
S

 

 

6.

Th
th

 

 

A
ch

 

 

astening with

ush the wire 

wheel and 

ull some cen

rap it compl

d place it ba

y pulling the 

uck into the 

fely.  

may be nece

le bit into th

pe can be lo

e retainer k

r winches sup

astening with

Push the w
flanged wh
plates (1). 
Pull some c
plate. 
Fasten the 

astening with

Push the w
(1). 
Pull some c
plate. 
Fasten the 

epending on 

und the dru

ee chapter "In

4 Win

e wire rope 

e flanged wh

  

NO

ccording to 

osen so tha  

 

 

h retainer ke

rope through

through the k
timeters out. 

etely round th

ck into the k

wire rope, the

pocket. This 

essary to inse

e hub with a s

aded. 

ey is attached

pplied withou

h clamping 

ire rope throu

eel and push

centimeters o

screws and f

h clamping 

ire rope unde

centimeters o

screws and f

the direction

m there are tw

nstallation". 

ding up of 

must always
eel must exc

TICE!

 

validated reg

t at least 2 ro

 

ey 

h the hub of t

key pocket. 

he retainer k

ey pocket. 

e retainer k

locks the wir

ert the retain

soft tool bef

d to the cons

ut wire rope. 

plates on t

ugh the hub 

h it under all 

out at the las

fix the rope 

plates on t

er all 3 clamp

out at the las

fix the rope 

n the rope is 

wo wire rope

wire rope 

s be winded 

ceed the top 

gulations a

ope layers re

 

the flanged 

ey (1) 

ey (1) gets 

re rope 

er key a 

ore the wire 

signment 

he flanged w

of the 

3 clamping 

t clamping 

herewith. 

he flanged w

ping plates 

t clamping 

herewith. 

winded 

 exits. 

up tensioned

layer by at le

nd accident 

main on the 

 

Illust

 

Illust

wheel 

 

Illust

wheel 

 

Illust

 

Illust

d. When the
east 1 1/2 ti

prevention 
drum when 

ration 5 

ration 6 

ration 7 

ration 8 

ration 9 

last wire rop

mes of the w

regulations, 

the wire rope

         

pe layer is w

ire rope diam

the wire r

e is unwinde

5.52.262

 

 

 

winded onto 

meter. 

ope length 

d. 

.00.01.08

 

the drum, 

must be 

Summary of Contents for 45/10E

Page 1: ......

Page 2: ...3 1 1 Indications to determine the used part of the theoretical usage life 4 2 Safety 4 2 1 Warning notice and symbols 4 2 2 Duty of care of the owner 4 2 3 Requirements for the operating personnel 5 2 4 Appropriate use 5 2 5 Basic safety measures 6 3 Transport and Storage 7 3 1 Transport 7 3 2 Safety device for transport 7 3 3 Storage 7 4 Description 7 4 1 Areas of application 7 4 2 Design 8 4 3 ...

Page 3: ...t selection 24 14 7 Lubricant for food industry selection as option 24 15 Trouble 24 16 Remedy 25 17 Decommissioning 26 17 1 Temporary decommissioning 26 17 2 Final decommissioning disposal 26 18 Additional documents 26 18 1 Electric wiring diagrams 26 18 2 Radio control as option 26 1 Information The products meet European Union requirements in particular the valided EU Machine Directive The enti...

Page 4: ......

Page 5: ......

Page 6: ......

Page 7: ......

Page 8: ...e o connect an winches Typ tationary us sembly hole d drum ed drum and all directions ection is dete drum the wi pplied as sta winding direc drum the dir ed by pressi tor of the lifti ponents ent motor filled with oi a ventilation eady assem ng winch on emergency l external ele e 45 10 E e s winches wit rmined for nding directi ndard ction of the w Wire ro ection of un ng the push ng gear pre l Fo...

Page 9: ... is fitted with stress relief rope not applicable for radio control 2 step buttons for 2 wire rope speeds Phase sequence monitoring relay All devices with low voltage control are equipped with a phase sequence and phase failure monitoring relay as a standard This will prevent incorrect phase sequence when connecting to the mains supply and will switch off the device if phase failure occurs In addi...

Page 10: ... 5 9 5 1 8 7 5 1 5 6 1 2 5 0 8 3 5 0 7 2 9 III m min 12 49 5 6 27 5 20 4 5 18 3 5 14 2 5 10 5 2 1 8 1 7 6 5 1 2 4 9 1 4 2 I 5 m min 5 5 22 3 5 14 2 5 10 2 7 5 2 7 1 4 5 5 1 1 4 3 0 9 3 5 0 7 2 8 II m min 8 5 36 5 5 20 4 16 5 3 12 5 2 5 10 5 2 8 1 6 6 5 1 3 5 4 1 9 3 8 0 8 3 2 III m min 13 5 54 5 7 30 5 5 22 5 19 5 4 15 5 2 5 11 5 2 3 9 1 8 7 1 385 3 1 1 4 6 Motor output I kW 1 4 5 5 1 4 5 5 1 4 5 ...

Page 11: ......

Page 12: ...here are tw nstallation ding up of must always eel must exc TICE validated reg t at least 2 ro ey h the hub of t key pocket he retainer k ey pocket e retainer k locks the wir ert the retain soft tool bef d to the cons ut wire rope plates on t ugh the hub h it under all out at the las fix the rope plates on t er all 3 clamp out at the las fix the rope n the rope is wo wire rope wire rope s be winde...

Page 13: ...ion 10 NOTICE Should the drum be extended and for some models with limit switch the distance M must be increased Standard values 15x 1 2 drum length for standard wire ropes 30x 1 2 drum length for twist resistant or non twisting wire ropes 6 5 1 Wire rope pulley provided by the customer table dimension M for standard drum length Capacity kg M min at 4 wirerope deflection m 2000 4 3200 4 6 4000 4 4...

Page 14: ...ery Pendant control lifting lowering direct control 1 Emergency Stop 2 Lifting slow fast 3 Lowering slow fast Illustration 11 Pendant control lifting lowering 1 Emergency stop 2 Lifting slow fast 3 Lowering slow fast Illustration 12 Radio control 1 Lowering slow fast 2 Lifting slow fast 3 no function 4 no function 5 no function 5 no function 6 no function 7 no function 8 start 9 start 10 emergency...

Page 15: ......

Page 16: ......

Page 17: ...allation or adjustment work the wire rope must be tensed by little load or the roller lever must carefully be actuated by hand The switch can also be taken out of service by dismantling the eccentric disc The slack rope switch will be installed in our factory according to customer s requirements Installation depends on the position of the winch and wire rope exit NOTICE Before commissioning the sw...

Page 18: ......

Page 19: ... 1 Turn the square 2 as far until the pressure roller puts enough pressure on the wire rope Hold the square and tighten the screw 1 again Illustration 19 12 7 Slack rope switch as option 12 7 1 Adjustment Illustration horizontally Other versions are possible Insert the wire rope 1 under the guiding pulley 4 and tighten it by the load Release the locking screw at the eccentric 6 Turn the eccentric ...

Page 20: ......

Page 21: ...iven devices out of operation and effect a General Overhaul Further use of the equipment is only allowed after a licensed qualified person has proofed that further use is possible without doubt and the conditions for further use have been determined These conditions have to be written down in the test book The owner user is responsible to make sure that these conditions are observed 13 2 Periodic ...

Page 22: ......

Page 23: ......

Page 24: ......

Page 25: ...ctric connection of the brake acc to the wiring diagram For motor driven units Brake linings are worn or dirty Brake lining carrier must be changed completely If the unit is suitable for explosive atmosphere the brake must be returned to the manufacturer for repair Air gap is too large Re adjust the air gap If the unit is suitable for explosive atmosphere the brake must be returned to the manufact...

Page 26: ......

Reviews: