8
5.52.732.00.01.05
6.1
Wall fastening
prepare fixing holes in the wall
put the wall bracket (1) onto the wall
Fix it with screws, discs and nuts (2) (on site)
Put through axle (4)
Adjust with water-level
Tighten screws (2)
Remove axle (4) again
Push the jib with ball bearings (3) into the wall
bracket
Put through the axle (4) from the bottom or
from the top again.
Protect with pin lock (5) and screw (6)
Check eventually existing end stops.
Illustration 3
For mounting of hoist unit and power supply see separate instruction.
6.2
Installation – Adjustable locking disc
Mount the stop brackets (3) on the locking disc
(2) at desired position.
Mount screws, nuts and castle nuts M12
Swivel jib to check position.
Tighten screws firmly.
Check screw connection!
Bild 4
NOTICE!
If the locking disc is to be mounted on an existing wall-mounted jib crane, the corresponding holes must be
drilled for the mounting on the opposite side.
6.3
Tools
No special tools necessary.
7
Operation
Only people that are familiar with the operation of the lifting devices and cranes may be entrusted with their
operation. They must be authorized by the employer for the operation of the equipment. The employer must
ensure that the operating instructions are available near the equipment and that they are accessible for the
operating personnel.
slewing by hand
depended of mounting height, at load or jib
Illustration5
SW41
SW46