background image

 

 

 

 

 

 

5.52.732.00.01.05

 

6.1 

Wall fastening 

  prepare fixing holes in the wall 
  put the wall bracket (1) onto the wall 
  Fix it with screws, discs and nuts (2) (on site) 
  Put through axle (4) 
  Adjust with water-level 
  Tighten screws (2) 
  Remove axle (4) again 
  Push the jib with ball bearings (3) into the wall 

bracket 

  Put  through  the  axle  (4)  from  the  bottom  or 

from the top again. 

  Protect with pin lock (5) and screw (6) 
  Check eventually existing end stops. 

 

 

Illustration 3 

 

For mounting of hoist unit and power supply see separate instruction. 

 

6.2 

Installation – Adjustable locking disc 

  Mount the stop brackets (3) on the locking disc 

(2) at desired position. 

  Mount screws, nuts and castle nuts M12 
  Swivel jib to check position. 
  Tighten screws firmly. 
  Check screw connection! 

 

       

  

Bild 4   

 

NOTICE!

 

If the locking disc is to be mounted on an existing wall-mounted jib crane, the corresponding holes must be 
drilled for the mounting on the opposite side. 

 

 

6.3 

Tools 

No special tools necessary. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Operation 

 

Only people that are familiar with the operation of the lifting devices and cranes may be entrusted with their 
operation. They must be authorized by the employer for the operation of the equipment. The employer must 
ensure that the operating instructions are available near the equipment and that they are accessible for the 
operating personnel.  

 

slewing by hand 
depended of mounting height, at load or jib  

 

 

Illustration5 

 

 

 

 

SW41 
SW46 

 

Summary of Contents for 320/01

Page 1: ...5 52 732 00 01 05 Rev 05 HADEF Wall mounted Jib Crane Type 320 01 Installation Operating and Maintenance Instructions...

Page 2: ...of Contents 1 Information 3 2 Safety 3 2 1 Warning notice and symbols 3 2 2 Duty of care of the owner 4 2 3 Requirements for the operating personnel 4 2 4 Appropriate use 5 2 5 Basic safety measures...

Page 3: ...to all instructions in this manual Before delivery all products are packed properly Check the goods after receipt for any damage caused during transport Report any damage immediately to the forwarding...

Page 4: ...lt free fully functional condition and the safety components in particular are checked regularly to ensure that it is functioning properly The required personal protective equipment for the operators...

Page 5: ...in studios persons must not stand under a suspended load 2 5 Basic safety measures Observe installation operation and maintenance instruction Take notice of caution notes at units and in the manual Ob...

Page 6: ...the local conditions 3 2 Safety device for transport NOTICE Should a safety device for transport exist please remove it before commissioning 3 3 Storage Store the equipment at a clean and dry place Pr...

Page 7: ...ous positions Depending on the design of the wall mounted jib crane the locking disc can be mounted on the upper or lower mounting bracket Illustration 2 5 Technical data Technical data depend on the...

Page 8: ...ing disc 2 at desired position Mount screws nuts and castle nuts M12 Swivel jib to check position Tighten screws firmly Check screw connection Bild 4 NOTICE If the locking disc is to be mounted on an...

Page 9: ...occupational training and experience and the job that the person has done the skills needed to tests the material for one s work Definition licensed qualified person former approved expert A licensed...

Page 10: ...ing conditions e g frequent operation with full load or special environmental conditions e g heat dust etc the intervals must be shortened correspondingly 12 Inspection 12 1 Periodic checks Independen...

Page 11: ...pter Safety instructions Notes on the repair of faults are found in the following table For the repair of failures please contact our service department CAUTION Trouble caused by wear or damage to par...

Page 12: ...sposal Measures are as above After disassembly ensure that the disposal of the equipment and any materials it contains is carried out in accordance with environmental regulations 17 Additional documen...

Reviews: