4.4 Install the lanyard
Install the lanyard to safely hold the meter. Refer to
Figure 5 Lanyard installation
4.5 Install the probe and USB port plugs
Install the port plugs in the probe port(s) and USB port when the ports are not in use to keep the
enclosure rating of the instrument. Refer to
Note:
shows a meter with three probe ports. Some meter models have only one or two probe ports.
Figure 6 Port plug installation
English
11
Summary of Contents for HQ1110
Page 2: ......
Page 12: ...Figure 4 Connect to the USB power adapter or a PC 10 English...
Page 37: ......