User Guide
TGT. 25.06.2019
Technical
Page 20 of 20
©Copyright by Habegger Maschinenfabrik AG
Version 04 / 25.06.2019
9
Disposal
Please refer to country-specific regulations for disposal.
Empty all oil from your HIT-TRAC.
Dispose of even the smallest quantity of oil professionally, i.e. take it to the relevant location.
When dismantling the machine, separate the different types of material as much as possible in order to facilitate recycling:
Store and recycle metals and plastics separately.
Consider the fact that protecting the environment and recycling materials helps us all.
10
Accessories
10.1
Supporting pipe
Using the supporting pipe, the rope can be effortlessly wound onto and unwound
from the winch.
1.
Remove crank handle
2.
Slide winch onto hub and
secure using star grip.
3.
Place rope under rope guide.
4.
Unwind rope.
5.
To wind the rope, clamp the crank handle to the winch.
-
For ropes longer than 50 m, we recommend using a winch drive in order to avoid faults or accidents
caused by the loose end of the rope lying around.
10.2
Storage boxes
A storage box can be used to store and transport the motor-driven rope pulling machine and
the rope.
10.1
Generators
To use the HIT-TRAC with a generator, an electrical output of at least 1 to 1.5 times the mo-
tor power must be generated.
HABEGGER will gladly support you in evaluating the generator.
HABEGGER Maschinenfabrik AG
Mittlere Strasse 66
CH-3600 Thun, Switzerland
Phone
+41 (0)33 225 44 44
Fax
+41 (0)33 225 44 40
Website
www.habegger-hit.ch