Operating instructions 36001
Appendix
Report sheet preventative maintenance
Hot-pressing device PT-55
Page 18 of
19
Edition: 04/0401
Subject to alterations
Machine type:
Machine no.:
Date of first placing in operation:
Actions to be performed – see checklist
Next
Performed
Next
Performed
Next
Performed
Next
Performed
(daily work not recorded)
Check
Initials Date
Check
Initials Date
Check
Initials Date
Check
Initials Date
2.1 Inspect the cable for damage
3.1 Measure the heater plate temperature
Observations, repairs: