5
Install panels 1-2.
6
Install the splash guard [1].
Install chip auger chutes [2]. Refer to the
steps 4 and 5 .
Install the pendant cable arm [3].
Route the pendant harness [4] through the arm
and attach the harness retainer [5].
Install the pendant arm cover.
7
Route the pendant cables [1] into the pendant [2]
and install the cable harness retainer.
Connect the cables to the SKBIF PCB. Refer
to
step 2 for
connections.
Install the back cover [3].
Attach the pendant assembly to the pendant
stand [4].
Install the dome plugs [5]
GM-2-5AX - Installation Guide
Page 13 of 15 pages