1
Install the enclosure frame over the tool changer
and secure it to the bridge using four 1/2-13 bolts
and washers.
Refer to the
for the correct torque value
NOTE:
The weight of the frame weldment is
approximately 160 lbs. Use the forklift or other
lifting device to lift the frame.
2
Install the front enclosure frame tubes [1] as
shown on the picture.
Use the following hardware [2] to secure the
frame tubes:
•
8X
SHCS 3/8-16 X 3"
•
8X
NUT 3/8-16 HEX
•
16X
WASHER 3/8 HARD
3
Install panels 1-8.
4
Install panels 1-4.
GM-2-5AX - Installation Guide
Page 12 of 15 pages