UMC-1000 Maintenance Schedule
48
Inspect way covers and lubricate.
Monthly
Minimum Quantity Lubrication
Clean the filter inside the oil reservoir.
Annually
Oil Skimmer
Inspect the oil skimmer pickup tube.
Six Months
Pneumatics
Inspect the spindle air regulator pressure.
Weekly
Inspect the hoses for cracking.
Six Months
Clean the Air Purge Solenoid.
Annually
Pneumatics
Inspect the spindle air regulator pressure.
Weekly
Inspect the hoses for cracking.
Six Months
Clean the air purge solenoid
Annually
Probe System
Check the probe batteries.
Six Months
Check the probe calibration.
Six Months
Rotary Axes
Inspect the oil.
Annually
Replace the oil.
Two Years
Replace the A-Axis counterbalance cylinder.
Two Years
Standard Flood Coolant System
Clean the filter screen.
As required
Inspect the coolant level.
Weekly
Maintenance Item
Interval
Summary of Contents for UMC-1000
Page 2: ......
Page 10: ...viii ...
Page 16: ...How to Use This Manual xiv ...
Page 36: ...Safety Decals 18 ...
Page 40: ...UMC 1000 Specifications 22 ...
Page 44: ...Machine Rotary Zero Point MRZP Offsets 26 ...
Page 50: ...G234 Tool Center Point Control TCPC Group 08 32 ...
Page 64: ...247 Simultaneous XYZ Motion in Tool Change 46 ...
Page 70: ...52 ...