6
Installation accessories
Table1-5 Installation accessories
Mounting bracket
M4 mounting bracket
screw
M6 rack screw (user
supplied)
Rubber feet
Cage nut (user supplied)
Grounding cable
Power cord retainer clip
Screw anchor and
screw
Console cable
Power cord
F100-C-A6-WL 4G
antenna
Wi-Fi antenna
Pre-installation checklist
Table1-6 Pre-installation checklist
Item
Requirements
Result
Installation
site
Ventilation
•
There is a minimum clearance of 100 mm (3.94 in)
around the inlet and outlet air vents for heat
dissipation of the firewall chassis.
•
A good ventilation system is available at the
installation site.
Ambient
temperature
•
Operating: 0°C to 45°C (32°F to 113°F)
•
Storage: –40°C to +70°C (–40°F to +158°F)
Ambient humidity
5% RH to 95% RH, noncondensing
Cleanness
•
Dust concentration ≤ 3 × 10
4
particles/m
3
•
No dust on desk within three days
ESD prevention
•
The equipment, workbench, and rack are reliably
grounded.
•
The equipment room is dust-proof.
•
The humidity and temperature are at an acceptable
level.
•
Wear an ESD wrist strap and make sure it makes
good skin contact and is reliably grounded when
installing removable components.
EMI prevention
•
Take effective measures to protect the power system
from the power grid system.
•
Separate the protection ground of the firewall from
the grounding device or lightning protection
grounding device as far as possible.