67
Index
A
Accessing the IRF fabric to verify the configuration,
C
Configuration terminal problems,
Configuring basic IRF settings,
Connecting the console cable,
Connecting the physical IRF ports,
Connecting the power cord,
E
Examining the installation site,
F
Fan failure,
FRUs and compatibility matrixes,
G
Grounding the switch,
H
Hot swappable fan trays,
Hot swappable power modules,
I
Installation tools,
Installing the switch in a 19-inch rack,
Installing/removing a fan tray,
Installing/removing a power module,
Installing/removing an interface card,
Interface cards,
IRF fabric setup flowchart,
L
LEDs,
M
Mounting the switch on a workbench,
P
Panel views for the S5120-28SC-HI and
S5120-52SC-HI,
Panel views for the S5120-34C-HI and S5120-58C-HI,
Planning IRF fabric setup,
Ports,
Power module failure,
Powering on the switch,
S
Safety recommendations,
Setting terminal parameters,
Setting up the configuration environment,
SFP/SFP+/XFP transceiver modules and SFP+/CX4
cables,
V
Verifying the installation,