8
Expert Net Control 2304
© 2022 GUDE Systems GmbH
Device Description
7. Status LED
8. Ethernet port status and activity (green and orange)
9. external sensor ("Sen.") plugged in indicator
10. Network connection (RJ45)
11. sensor connection (RJ45)
12. AC mains power supply
13. 8x relay switching contacts (NO)
Commissioning
·
Connect the device to the mains supply or to a suitable low voltage source (see tech-
nical data).
·
Plug the network cable into the Ethernet socket (RJ45).
·
Connect the relays to the loads that are to be operated.
·
Establish contact between the lines to be monitored and the digital inputs.
·
Connect a sensor (if available).
1.4.1
Connection Example
Here is an example with block diagram in which the device is supplied with 230V AC and
in which eight AC loads (L1 - L8) are connected. In addition, the inputs are assigned
eight switches (S1 - S8).
As an alternative to connecting "In 1-8" and "GND", voltages can also be fed in
between "In 1-8" and GND. The maximum input voltage is 24V, voltages below 3V are
detected as LOW state, and voltages above 8V are detected as HI.
Summary of Contents for Expert Net Control 2304
Page 1: ...Manual Expert Net Control 2304 2022 GUDE Systems GmbH Manual Ver 1 0 1 from Firmware Ver 1 0 ...
Page 2: ...2 Expert Net Control 2304 2022 GUDESystems GmbH ...
Page 5: ...Device Description ...
Page 12: ...Operating ...
Page 23: ...Configuration ...
Page 52: ...Specifications ...
Page 87: ...Support ...