17
At this stage of the installation, the opener should be installed on the
gate and the closed position stop should be in place.
Check List
• The gate is plumb, level, and swings smoothly on its hinges.
• A plate or support was added for the gate bracket (if necessary).
• The opener is level and mounted on the centerline of the gate.
Horizontal Cross Member
Gate Swings Evenly and Freely
Hung Firmly and Plumb
Post Bracket Assembly
Gate Bracket
Single Gate Opener
Fence Post Set in Concrete
Power Cable
Closed Position Positive Stop Plate
Preparing to Activate the System
In order to have easy access to the control board during the rest of the installation,
remove the opener and remount it upside down.
Bottom
Access Panel
ON
OF
F
ON/OFF
Switch
IMPORTANT:
Return the opener arm to the
upright position when installation
is complete to prevent water
damage to the control board.