![GSWeb Playground Equipment GS-W5002 Installation Manual Download Page 8](http://html.mh-extra.com/html/gsweb-playground-equipment/gs-w5002/gs-w5002_installation-manual_2275789008.webp)
NET JUMPER
MODEL NO.
GS-W5002
GSWeb Playground Equipment
6
Concrete Foundation
Concrete
Pour concrete* into wooden support frame until flush to top edge
Allow 3-5 days for concrete to cure before proceeding to next step.
*Concrete is to be wet concrete with minimum 25 MPA.
Remove wood support frame from dry concrete blocks
After concrete has cured enough, remove frame and replace soil
in area around footing to subgrade level
Figure-6:
Concrete footing
Assemble wooden support frames *
4 frames (78-3/4" / 2000mm L x 23-2/3" / 600mm W x 19-2/3" / 500mm H)
*Use
½
" (min) plywood; not included in package
NOTE:
Use anchor plate as guide for exact
measurements.
Metric/Imperial conversion:
1750mm = 5' 8-7/8"
3500mm = 11' 5-3/4"
3750mm = 12' 3-5/8"
7500mm = 24' 7-1/4"
Metric/Imperial conversion:
25mm / 30mm = 1" 200mm = 7-7/8"
100mm = 4" 250mm = 9-7/8"
150mm = 6" 600mm = 1' 11-1/2"
190mm = 7-1/2"
Summary of Contents for GS-W5002
Page 1: ......