Unit 2, 110 Station Road, Seven Hills ,NSW,  2147, Australia

Basic Wiring Instructions:

MPPT12-1 General Information:

 This MPPT is designed to auto detect 12V and 24V battery systems and select a suitable 

  charge regime.

  or 24V batteries respectively.

 The absorption phase is entered following a low battery condition and is maintained for 

  approx. 1.5 hours.

.

 This MPPT has a built in multilevel over temperature protection to improve product reliability  

  while maximising output power availability. 

 The peak maximum output power is 250W and the continuous output power is 150W on 12V 

   systems and 200W on 24V.

  over 20%. 

 The fuse PVF can be replaced by a suitably heatsinked 20A 60V schottky diode ( its anode 

  connected to the + panel and cathode to the MPPT white wire). This diode will avoid a small 
  drain during night time (approx. 0.04A ) as well as protect against panel short but it will also 
  slightly decrease the battery charge current.

Note: 

First start up may take up to one minute.

MPPT12-1-R5

Summary of Contents for MPPT12-1

Page 1: ...n 17V for 12V Charging and 34V for 24V Charging Use wires suitable for at least 15a but if wire runs are over 3m then larger wires are recommended to limit voltage drop and losses Install the unit in a dry place out of direct sunlight and away from flammable liquids or gases Battery fuse BF is always required and must be located as close to the battery as possible its sizing depends on the wire si...

Page 2: ...aintained for approx 1 5 hours This MPPT has a built in multilevel over temperature protection to improve product reliability while maximising output power availability The peak maximum output power is 250W and the continuous output power is 150W on 12V systems and 200W on 24V over 20 The fuse PVF can be replaced by a suitably heatsinked 20A 60V schottky diode its anode connected to the panel and ...

Page 3: ...xpect about 30AH which is a 40W load for about 15 hours Q Why are MPPT used mainly in high power systems Until now and despite their overwhelming advantages MPPTs have been excluded from low power systems because of cost The new GSL MPPT specifically designed for low power makes economic sense even in small systems Q What sort of batteries should I use 1 A deep cycle battery is a must due to the c...

Page 4: ... 35 X 75 X 100mm Indications Dual LED display battery OK LOW Unit 2 110 Station Road Seven Hills NSW 2147 Australia recommended battery capacity of at least 60AH 2 A larger battery will not only give longer run time during low light but also will be able to avoid available PV power being unstored such as when battery reaches the float stage Q How does PV temperatures affects charge current Tempera...