GSi PNEG-902 Installation Manual Download Page 6

6

                                 

PNEG-902 

Multi - Module Dryer Stacking

1. Safety

Wear Protective Clothing

Wear close fitting clothing and safety equipment appropriate
to the job.

Remove all jewelry.

Long hair should be tied up and back.

Safety glasses should be worn at all times to protect eyes 
from debris.

Wear gloves to protect your hands from sharp edges on 
plastic or steel parts.

Wear steel toe boots to help protect your feet from falling 
debris. Tuck in any loose or dangling shoe strings.

A respirator may be needed to prevent breathing potentially 
toxic fumes and dust.

Wear hard hat to help protect your head.

Eye Protection

Gloves

Steel Toe Boots

Respirator

Hard Hat

Install and Operate Electrical Equipment Properly

Electrical controls should be installed by a qualified electrician 
and must meet the standards set by the National Electrical Code 
and all local and state codes.

Disconnect and lock out all power sources before installing 
wires/cables or servicing equipment.

Electric Shock Hazard

Install and Operate Gas-Fired Equipment Properly

Fuel supply should be installed by a qualified gas 
technician and must meet local and state codes for 
gaseous fuel supplies.

Disconnect and lock out all fuel sources before 
servicing equipment.

Explosive Gases

Stay Clear of Hoisted Equipment

Always use proper lifting/hoisting equipment when 
assembling or disassembling equipment.

Do not walk or stand under hoisted equipment.

Always use sturdy and stable supports when needed 
for installation.

Crush Hazard

Summary of Contents for PNEG-902

Page 1: ...PNEG 902 Multi Module Dryer Stacking Review of Stacking a Dryer Installation Manual PNEG 902 Date 07 26 07...

Page 2: ...2 PNEG 902 Multi Module Dryer Stacking...

Page 3: ...king a Network Dryer 7 Chapter 3 Module Preparation and Installation 8 Crane Bracket Placement 9 Setting Lower Module on Pedestals 10 Anchoring Lower Module to Foundation 11 Installing Support Legs 12...

Page 4: ...suse of the equipment and may lead to serious injury or death This is the safety alert symbol It is used to alert you to potential personal injury hazards Obey all safety messages that follow this sym...

Page 5: ...owed in all cases Authorities having jurisdiction should be consulted before installations are made Follow Safety Instructions Carefully read all safety messages in this manual and safety signs on you...

Page 6: ...Hat Install and Operate Electrical Equipment Properly Electrical controls should be installed by a qualified electrician and must meet the standards set by the National Electrical Code and all local a...

Page 7: ...G 902 Multi Module Dryer Stacking 7 2 Stack Dryer Component Callout Stacking a Network Dryer The following information is intended to help outline the steps required in stacking a Network Dryer Figure...

Page 8: ...Chapter 4 of this manual See PNEG 1273 for reference Raise the top auger to its installed position Install the wet bin side panels and attach them to the top auger housing Install the pulleys belts an...

Page 9: ...s will vary with model number The module should remain parallel to the earth as it is lifted Figure 3A Top Module Crane Brackets Top modules utilize two 2 crane brackets with four 4 lifting points and...

Page 10: ...h the base module in position bolt a pedestal to each stiffener base connector clip using 3 8 16 x 1 1 2 bolts S 7928 See Figure 3D Figure 3D Figure 3E 3 With a stiffener splice SS 7053 splice the ped...

Page 11: ...was poured drill holes in the foundation to accept anchor bolts use 3 4 x 9 5 8 minimum anchors with epoxy resin See Figure 3I and Figure 3J GSI has 1 x 12 anchor bolts Part S 8957 tubes of epoxy GTC...

Page 12: ...he support leg and dryer frame On the right side it may be necessary to remove the cotter pin and slide the clean out door pivot rod forward enough to insert the top bolt See Figure 3L Figure 3L 8 Use...

Page 13: ...s S 2120 and nuts S 6493 as shown in Figure 3N Figure 3N 10 Lift upper module and move into place over lower module Use a guide line to keep module steady while it is being moved See Figure 3O Figure...

Page 14: ...as a tab that extends below module frame This tab will slide into the lower module just behind the plenum end panel See Figure 3P Figure 3P 12 When the upper module is set in place and the crane is be...

Page 15: ...le bracket of the lower module to the frame tie channel of the upper module There may be a small gap between these two parts if so the 5 16 bolts connecting the top angle bracket to the lower module c...

Page 16: ...nal standards and regulations relevant to your country and region A mains power isolator should be installed with the stack dryer unit and is essential for your safety This should be installed as indi...

Page 17: ...5A Figure 5B and Figure 5C 2 Use five 5 44 safety cage vertical supports LS 4353 and connect the small and large bell hoops assembled in the Step 1 using 5 16 18 x 3 4 bin bolts S 275 and 5 16 18 nuts...

Page 18: ...y seven 7 of the 44 safety cage vertical supports LS 4353 See Figure 5D 5 Assemble eight 8 small hoop halves to make four small safety cage hoops Connect these hoops together with five 5 34 vertical s...

Page 19: ...PRODUCTS GSI SHALL NOT BE LIABLE FOR ANY DIRECT INDIRECT INCIDENTAL OR CONSEQUENTIAL DAMAGES INCLUDING WITHOUT LIMITATION LOSS OF ANTICIPATED PROFITS OR BENEFITS PURCHASER S SOLE AND EXCLUSIVE REMEDY...

Page 20: ...gulations which should be carefully followed in all cases Authorities having jurisdiction should be consulted before installations are made GSI Group 1004 E Illinois St Assumption IL 62510 0020 Phone...

Reviews: