![GSi PNEG-902 Installation Manual Download Page 16](http://html1.mh-extra.com/html/gsi/pneg-902/pneg-902_installation-manual_2275003016.webp)
16
PNEG-902
Multi - Module Dryer Stacking
4. Module Finishing
•
Connect wiring between modules making sure all connections are secure.
•
Contact the electrical service provider to connect power.
•
Connect fuel connections between modules making sure all connections are secure and no
leaks are present.
•
Contact the fuel service provider to connect fuel supply.
Electrical Safety
Provision of an adequate and safe power supply to the stack dryer unit is
essential to your safety. A competent and qualified electrician must undertake
all electrical wiring. All wiring is to be installed according to the national
standards and regulations relevant to your country and region.
A mains power isolator should be installed with the stack dryer unit and is
essential for your safety. This should be installed as indicated in the enclosed
installation instructions and in accordance with the relevant directives in force.
Fuel Safety
Provision of an adequate and safe fuel supply to the stack dryer unit is
essential to your safety. A competent and qualified fuel serviceman must
undertake all fuel connections. All fuel connections are to be installed to the
national standards and regulations relevant to your country and region.
A mains fuel isolator should be installed with the stack dryer unit and is
essential for your safety. This should be installed as indicated in the enclosed
installation instructions.