
PNEG-1859
2.66" Corrugation 135' Diameter Tank with 50 PSF Snow Roof
29
7. Installation
Base Angle Installation
On the lower edge of the final bottom ring, attach the base angle ring. Before lowering the bin, sealing
provision need to be taken for the entire underneath side of the base angle.
the bin onto the foundation and check for an adequate seal.
Sealing the base of the bin after final construction is done by various methods and materials, based on
materials available, preferences of the customer, etc. However provisions must be made to seal the base
of the bin to prevent moisture from coming into the bin.
Figure 7A