![GSi PNEG-1707 Operation Manual Download Page 30](http://html1.mh-extra.com/html/gsi/pneg-1707/pneg-1707_operation-manual_2275001030.webp)
30
PNEG-1707
TM-Series Tower Dryer
6. Vision Touch Screen Display
Boot Screen
Turning the Power switch in the ON position, will start the Vision computer. The first screen to appear will
be the Boot screen.
Notice that there are four (4) “buttons” on the Boot screen. Install
Dryer Software and Get Program From USB Flash buttons are only used for program updates that may
be released at a later date. Touching the Start Dryer button will display the Default Operation screen.
Touching the Exit To Windows button will close down the dryer program and take you to the Windows CE
Operating System.
Figure 6A
Default Operation Screen
As you can see the Operation screen is divided into five (5) sections.
1.
Dryer operation animation:
Located on the left side of the Operation screen the operation animation
shows the status of the fan/heaters, load and unload augers and meter rolls. It will also display the
grain temperature, moisture content, M/C set point and bushel counter.
2.
Dryer status:
Located at the very top of the right side of the Operation screen the dryer status will
tell you if the dryer is stopped, started, loading or unloading.
3.
Dryer status chart:
Located directly below dryer status chart. This chart will show the grain
temperature, moisture in/out, temperature out and M.R.O. over a period of time.
4.
Plenum:
Located directly below dryer status chart. This chart will show the plenum temperature set
point (SP), actual plenum temperature and burner status.
5.
Setup buttons:
Located across the bottom of the Operation screen. By touching these buttons the
timers, temperature set points, dryer model and moisture control can be set up.
These two (2) buttons are
used to update software.