![GSi PNEG-1057 Assembly And Operation Manual Download Page 20](http://html1.mh-extra.com/html/gsi/pneg-1057/pneg-1057_assembly-and-operation-manual_2275151020.webp)
20
PNEG-1057
8" and 10" Commercial Vertical Bin Unload Auger
5. 10" Vertical Assembly Instructions
Motor Mount Rod to Head Plate Assembly
1. Screw one 7/8" hex head nut to the top of each motor mount rod (E).
2. Slide the motor mount rods through the head plate assembly.
3. Line up slot on the plate end of the motor mount rods (E) with the slot on the head plate assembly
(C). Fasten them together using 3/8" carriage bolt, a split flat washer and a nut.
4. Attach a 7/8" hex head nut onto the bottom of each motor mount rod. Tighten until nut rests against
the head plate assembly (C).
5. Adjust top 7/8" hex head nuts down until they rests against the top of the head plate assembly (C).
Tube Assembly
1. Connect the 4-hole flange bearing (H) to head plate assembly (C) using four (4) 1/2" x 1-1/2" bolts
with lock nuts.
2. Loosen the top and bottom nuts on the head plate assembly (C) to allow the belt guard mounting
angles (I) to slide onto the motor mount rods (E). Once the angles are in place tighten nuts to keep
rods in position.
3. Connect head drive stub shaft (J) to flight using two (2) 1/2" x 3-1/2" (grade 5) bolts with lock nuts.
4. Slide head plate assembly (C) over discharge end of tube and tighten the half band clamps (D) using
four (4) 5/16" x 1-3/4" bolts with nuts. Slip bearing lock collar (not shown) over head drive stub.
5. Fasten belt guard (L) to top mounting angle (I) using two (2) 5/16" x 3/4" carriage bolts with
flat washers, lock washers and nuts.
NOTE:
Leave carriage bolts loose until later.
6. Place head drive stub shaft (J) through head bearing with enough extended to mount pulley (K) with
key (B). Tighten bearing with lock collar and tighten set screws in pulley.
7. Install motor and pulley onto motor mount.
(Motor and pulley are not included.)
Install belts (A) and
tighten by adjusting motor height by using the four (4) 3/4" nuts on the rods.
8. Close door on belt guard and latch.
9. Secure 45° discharge spout (M) Over the discharge opening using the head plate assembly and
eight (8) 5/16" x 1-1/2" long bolts with nuts.
10. After everything has been adjusted, go back and tighten all nuts and bolts.