![GSi PNEG-1057 Assembly And Operation Manual Download Page 15](http://html1.mh-extra.com/html/gsi/pneg-1057/pneg-1057_assembly-and-operation-manual_2275151015.webp)
4. 8" Vertical Assembly Instructions
PNEG-1057
8" and 10" Commercial Vertical Bin Unload Auger
15
Tube Assembly (Continued)
Figure 4A 8" Vertical Tube Assembly
Ref #
Description
Ref #
Description
A
Belt (57")
H
Head Plate Assembly
B
Half Band
I
Flange Bearing
C
Half Band Clamp
J
Head Drive Shaft
D
45° Discharge Spout
K
Belt Guard
E
Motor Mount Top Strap
L
Mount Pulley
F
Motor Mount Bottom Strap
M
Mounting Angle
G
Motor Mount Rod
N
Key
Lock out all power sources while installing or maintaining equipment.
Keep all safety devices and shields in place at all times until power source is
locked out.