10. 4 x 5 Distributor Platform (Optional)
76
PNEG-1807CE
CE Compliant 16"-24" Bucket Elevator Platform and Ladder “X” Series
24" Attach Bottom Clamp Band to Trunking and Knee Brace
1. Slide rods of clamp rod weldment into inside set of holes of clamp bands for 16" assembly. Fasten
together using four (4) 1/2" hex flange nuts.
2. Orient the brace channels so the bends face outwards and line up the brace channel holes with the
holes located near the middle of the 16"-24" long clamp clips. Line up the clamp strut with the same
set of holes as the brace channel and 16"-24" long clamp clip. Fasten all five (5) together using
four (4) 1/2" x 1" bolts and nuts. Attach remaining clamp strut to the end of the 16"-24" clamp clip.
Tighten only finger tight.
3. Assemble the clamp rod weldment, clamp channel and brace channel assembly at same time around
the trunking. Place clamp rod weldment assembly around the trunking leg and line up holes on
16"-24" long clips and clamp channel with the
outside set of holes
on the clamp rod weldment.
Fasten all three (3) together using six (6) 1/2" x 1" bolts and nuts.
Figure 10D
Ref #
Part #
Description
Ref #
Part #
Description
A
GSB30147
Brace Channel
E
DSP16005
Clamp Rod Weldment
B
DSP1624TRF
Long Clamp Clip for 16"-24"
F
DSP1624TRFS
Clamp Strut for 16"-24" Trunking
C
DSP16001
Clamp Channel
G
S-7935
1/2" x 1" Bolt
D
DSP16002
Distributor Clamp Band
H
S-8506
1/2" Hex Flange Nut
24" Distributor Deck Bottom Clamp Band