![GSI Group PNEG-1445 Assembly & Operation Manual Download Page 17](http://html1.mh-extra.com/html/gsi-group/pneg-1445/pneg-1445_assembly-and-operation-manual_2275206017.webp)
PNEG-1445 6", 8", 10", & 12" Custom Augers
17
4. ASSEMBLY
Figure 4D
5. Installing the Motor Mount Plate
A. Secure one (1) of the motor mount adjustment nuts and one (1) the motor mount
adjustment washers approximately 3/4 of the way down the motor mount adjuster’s
threaded shaft.
B. Once the nut and washer is secure, slip the Motor Mount Plate over the adjuster and
align the pivot holes with the pivot tube.
Figure 4E
C. Slide the Motor Mount Pivot Rod through the pivot tube on the Discharge Tube.
D. When the pivot rod begins to extend through the pivot tube install the spacers,
BETWEEN the Back Plate and the inner face of the Motor Mount Plate.
Summary of Contents for PNEG-1445
Page 1: ...PNEG 1445 6 8 10 12 Custom Augers Assembly Operation Manual PNEG 1445 Date 05 08 07...
Page 2: ...2 PNEG 1445 6 8 10 12 Custom Augers...
Page 42: ...42 PNEG 1445 6 8 10 12 Custom Augers NOTES...
Page 44: ...44 PNEG 1445 6 8 10 12 Custom Augers 9 PARTS LIST 6 Custom Auger Parts...
Page 46: ...46 PNEG 1445 6 8 10 12 Custom Augers 9 PARTS LIST 8 Custom Auger Parts...
Page 48: ...48 PNEG 1445 6 8 10 12 Custom Augers 9 PARTS LIST 8 Internal Bearing Parts...
Page 50: ...50 PNEG 1445 6 8 10 12 Custom Augers 9 PARTS LIST 10 Custom Auger Parts...
Page 52: ...52 PNEG 1445 6 8 10 12 Custom Augers 9 PARTS LIST 10 Internal Bearing Parts...
Page 54: ...54 PNEG 1445 6 8 10 12 Custom Augers 9 PARTS LIST 12 Custom Auger Parts...
Page 56: ...56 PNEG 1445 6 8 10 12 Custom Augers 9 PARTS LIST 12 Internal Bearing Parts...