![GSI Group PNEG-1204 Installation And Operation Manual Download Page 21](http://html1.mh-extra.com/html/gsi-group/pneg-1204/pneg-1204_installation-and-operation-manual_2275159021.webp)
4. Conveyor Assembly
PNEG-1204
Enclosed Belt Conveyor
21
Loader Installation (Continued)
Swing-Up Skirt Loader
1. If the loader doesnot line up exactly with an intermediate cover, the intermediate covers will need to
be cut to fit. If this is necessary, properly position loader and cut a section from the covers so they
will fit between the cover channel bolted to next section and the loader flange. Weld cover back
together to achieve required length. Repaint welded area to prevent rusting.
Figure 4K Swing-Up Skirt Loader
2. The UHMW swing-up skirts should not touch the conveyor belt as they can cause wear to the belt.
Use the adjustable set screws to locate the position of the skirts.
REMOVE PAINT BEFORE WELDING OR CUTTING.
Avoid hazardous fumes that can be generated when paint is heated by welding
or torching. Do all work outside or in a well-ventilated area. Dispose of paint and
solvent properly.
Remove paint before welding or heating:
• If you use sand or grind paint, avoid breathing the dust. Wear an
approved respirator.
• If you use solvent or paint stripper, remove stripper with soap and water before
welding. Remove solvent or stripper containers and other flammable material
from area. Allow fumes to disperse for at least 15 minutes before welding
or heating.
DANGER