Grundfos MCB 114 Installation And Operating Instructions Manual Download Page 5

5

4.2 Fitting the MCB 114 in the CUE 

4.2.1 Enclosures A2, A3 and B3

1. Turn off the power to the CUE. See section 

4.

2. Remove the control panel, the terminal cover and the frame 

from the CUE. See fig. 3.

3. Fit the MCB 114 into port B.

4. Connect the signal cables, and fasten the cables with the 

enclosed cable strips.

5. Remove the knock-out plate in the extended frame so that the 

MCB 114 fits under the extended frame.

6. Fit the extended frame and the terminal cover.

7. Fit the control panel in the extended frame.

8. Connect power to the CUE.

9. Set the input functions in the displays as shown in section 

6.5.1

 of the CUE installation and operating instructions.

 

Fig. 3

Enclosures A2, A3 and B3

4.2.2 Enclosures A5, B1, B2, B4, C1, C2, C3, C4, D1 and D2

1. Turn off the power to the CUE. See section 

4

.

2. Remove the control panel and the cradle from the CUE. See 

fig. 4.

3. Fit the MCB 114 into port B.

4. Connect the signal cables, and fasten the cables with the 

enclosed cable strips. See fig. 4.

5. Fit the cradle and the control panel.

6. Connect power to the CUE.

7. Set the input functions in the displays as shown in section 

6.5.1

 of the CUE installation and operating instructions.

 

Fig. 4

Enclosures A5, B1, B2, B4, C1, C2, C3, C4, D1 and D2

4.3 CUE displays

For further information, see section 

6.5.1 

of the CUE installation 

and operating instructions.

5. Service

5.1 Service documentation

Service documentation is available on www.grundfos.com > 
International website > WebCAPS > Service.

If you have any questions, please contact the nearest Grundfos 
company or service workshop.

6. Technical data

6.1 Surroundings

6.2 Cable length

6.3 Analog inputs

All analog inputs are galvanically separated from the supply 
voltage (PELV) and other high-voltage terminals.

7. Disposal

This product or parts of it must be disposed of in an 
environmentally sound way:

1. Use the public or private waste collection service.

2. If this is not possible, contact the nearest Grundfos company 

or service workshop.

TM

04

 00

25

 48

07

TM

04

 0

027

 4

807

Frame

Port B

CUE

Cradle

Port B

Displays for reading

(2.5), (2.12) and (2.13)

Displays for setting

(3.16), (3.21) and (3.22)

Relative humidity

5-95 % RH

Ambient temperature during operation

–10 to 55 °C

Temperature during storage and 
transportation

–25 to 70 °C

Maximum length, signal cable

300 m

Analog input 3

, terminal number

2

Current range

0/4-20 mA

Input resistance

< 200 

Ω

Analog inputs 4 and 5

, terminal number

4, 5 and 7, 8

Signal type, 2- or 3-wire

Pt100/Pt1000

Subject to alterations.

Summary of Contents for MCB 114

Page 1: ...MCB 114 sensor input module GRUNDFOS INSTRUCTIONS Installation and operating instructions...

Page 2: ...2...

Page 3: ...3 MCB 114 sensor input module Installation and operating instructions 4 Montage und Betriebsanleitung 6 Monterings og driftsinstruktion 8...

Page 4: ...nical documentation is available on www grundfos com International website WebCAPS If you have any questions please contact the nearest Grundfos company or service workshop 3 Scope of delivery The MCB...

Page 5: ...llation and operating instructions Fig 4 Enclosures A5 B1 B2 B4 C1 C2 C3 C4 D1 and D2 4 3 CUE displays For further information see section 6 5 1 of the CUE installation and operating instructions 5 Se...

Page 6: ...auf auf der Internetseite www grundfos de unter WebCAPS verf gbar Bei weiteren Fragen wenden Sie sich bitte an die n chste Grundfos Niederlassung oder autorisierte Servicewerkstatt 3 Lieferumfang Zum...

Page 7: ...tion f r die Eing nge in dem entsprechenden Bild schirm wie im Abschnitt 6 5 1 der CUE Betriebsanleitung beschrieben ausw hlen Abb 4 Geh use A5 B1 B2 B4 C1 C2 C3 C4 D1 und D2 4 3 CUE Bildschirmseiten...

Page 8: ...nsomformeren Teknisk dokumentation er tilg ngelig online p www grundfos com International website WebCAPS Har du sp rgsm l er du velkommen til at kontakte n rmeste Grundfos selskab eller servicev rkst...

Page 9: ...CUE Fig 4 Kapsling A5 B1 B2 B4 C1 C2 C3 C4 D1 og D2 4 3 Displaybilleder til CUE Yderligere oplysninger se afsnit 6 5 1 i monterings og driftsin struktionen til CUE 5 Service 5 1 Servicedokumentation S...

Page 10: ...anda Shiagawa ku Tokyo 141 0022 Japan Phone 81 35 448 1391 Telefax 81 35 448 9619 Korea GRUNDFOS Pumps Korea Ltd 6th Floor Aju Building 679 5 Yeoksam dong Kangnam ku 135 916 Seoul Korea Phone 82 2 531...

Page 11: ...www grundfos com Being responsible is our foundation Thinking ahead makes it possible Innovation is the essence 96794550 0609 21 Repl 96794550 1008...

Reviews: