Grundfos MCB 114 Installation And Operating Instructions Manual Download Page 4

4

CONTENTS

Page

1.

Symbols used in this document

4

2.

Introduction

4

2.1

General description

4

2.2

Applications

4

2.3

References

4

3.

Scope of delivery

4

4.

Installation

4

4.1

Wiring diagram

4

4.2

Fitting the MCB 114 in the CUE 

5

4.3

CUE displays

5

5.

Service

5

5.1

Service documentation

5

6.

Technical data

5

6.1

Surroundings

5

6.2

Cable length

5

6.3

Analog inputs

5

7.

Disposal

5

1. Symbols used in this document

2. Introduction

This manual introduces all aspects regarding installation of your 
Grundfos MCB 114 sensor input module. 

2.1 General description

The MCB 114 is an analog sensor input module for the CUE.

2.2 Applications

The MCB 114 offers three additional analog inputs for the CUE:

one analog 0/4-20 mA input for an additional sensor

two analog Pt100/Pt1000 inputs for temperature sensors.

2.3 References

Technical documentation for Grundfos CUE:

This manual contains all information required for installation of 
the MCB 114.

The CUE installation and operating instructions contain all 
information required for putting the CUE into operation.

The CUE data booklet contains all technical information about 
the construction and applications of the CUE.

The service instructions contain all required instructions for 
dismantling and repairing the frequency converter.

Technical documentation is available on www.grundfos.com > 
International website > WebCAPS.

If you have any questions, please contact the nearest Grundfos 
company or service workshop.

3. Scope of delivery

The MCB 114 sensor input module comes with a terminal cover, 
an extended frame and an identification label to put onto the 
CUE.

 

Fig. 1

Scope of delivery

4. Installation

4.1 Wiring diagram

 

Fig. 2

Wiring diagram, MCB 114

Terminals 10, 11 and 12 are not used.

Warning

Prior to installation, read these installation and 
operating instructions. Installation and operation 
must comply with local regulations and accepted 
codes of good practice.

Warning

If these safety instructions are not observed, 
it may result in personal injury!

TM

04

 00

26 

48

07

Warning

Touching the electrical parts may be fatal, even 
after the CUE has been switched off.

Before making any work on the CUE, the mains 
supply and other voltage inputs must be 
switched off for at least as long as stated in the 
CUE installation and operating instructions.

T

M

04

 32

73

 39

08

Terminal

Type

Function

1 (VDO)

+24 V out Supply to sensor

2 (I IN)

AI 3

Sensor 2, 0/4-20 mA

3 (GND)

GND

Common frame for analog input

4 (TEMP)
5 (WIRE)

AI 4

Temperature sensor 1, Pt100/Pt1000

6 (GND)

GND

Common frame for temperature sensor 1

7 (TEMP)
8 (WIRE)

AI 5

Temperature sensor 2, Pt100/Pt1000

9 (GND)

GND

Common frame for temperature sensor 2

Extended frame

Terminal cover

MCB 114 sensor 
input module

1

9

8

7

6

5

4

3

2

1

2

1

1

1

0

VDO

I IN

GND

TEMP

WIRE

GND

TEMP

WIRE

GND

+

-

+

Summary of Contents for MCB 114

Page 1: ...MCB 114 sensor input module GRUNDFOS INSTRUCTIONS Installation and operating instructions...

Page 2: ...2...

Page 3: ...3 MCB 114 sensor input module Installation and operating instructions 4 Montage und Betriebsanleitung 6 Monterings og driftsinstruktion 8...

Page 4: ...nical documentation is available on www grundfos com International website WebCAPS If you have any questions please contact the nearest Grundfos company or service workshop 3 Scope of delivery The MCB...

Page 5: ...llation and operating instructions Fig 4 Enclosures A5 B1 B2 B4 C1 C2 C3 C4 D1 and D2 4 3 CUE displays For further information see section 6 5 1 of the CUE installation and operating instructions 5 Se...

Page 6: ...auf auf der Internetseite www grundfos de unter WebCAPS verf gbar Bei weiteren Fragen wenden Sie sich bitte an die n chste Grundfos Niederlassung oder autorisierte Servicewerkstatt 3 Lieferumfang Zum...

Page 7: ...tion f r die Eing nge in dem entsprechenden Bild schirm wie im Abschnitt 6 5 1 der CUE Betriebsanleitung beschrieben ausw hlen Abb 4 Geh use A5 B1 B2 B4 C1 C2 C3 C4 D1 und D2 4 3 CUE Bildschirmseiten...

Page 8: ...nsomformeren Teknisk dokumentation er tilg ngelig online p www grundfos com International website WebCAPS Har du sp rgsm l er du velkommen til at kontakte n rmeste Grundfos selskab eller servicev rkst...

Page 9: ...CUE Fig 4 Kapsling A5 B1 B2 B4 C1 C2 C3 C4 D1 og D2 4 3 Displaybilleder til CUE Yderligere oplysninger se afsnit 6 5 1 i monterings og driftsin struktionen til CUE 5 Service 5 1 Servicedokumentation S...

Page 10: ...anda Shiagawa ku Tokyo 141 0022 Japan Phone 81 35 448 1391 Telefax 81 35 448 9619 Korea GRUNDFOS Pumps Korea Ltd 6th Floor Aju Building 679 5 Yeoksam dong Kangnam ku 135 916 Seoul Korea Phone 82 2 531...

Page 11: ...www grundfos com Being responsible is our foundation Thinking ahead makes it possible Innovation is the essence 96794550 0609 21 Repl 96794550 1008...

Reviews: