10
11
Again press
START
key approximately for 3
secs and release when the unit makes a
“Beep” sound and a countdown timer
starts on the LCD screen as shown below
Pump stops running and parameter
calibration completed, and LCD screen looks
as below
This needs to be carried out whenever pump is repaired or a new pump
is installed, previous parameters needs to be erased before the unit is
re-calibrated.
Follow the below instructions to erase the parameter calibration:
1
Press the MODE key to switch to manual mode. make sure
the pump is not running.
2
Press the STOP key approximately for 3 secs and release
when the unit makes a “Beep” sound.
Unit is now back to factory settings, “NO CALIBER” sign will start flashing
on the LCD screen. For re-calibration, follow the instruction as given in
“CALIBRATION” section.
ERASING:
NOTE: For all applications, connect the "NO" contact of
float switch in down position.
INSTALLING LIQUID LEVEL PROBES SWITCH:
LIQUID PROBE INSTALLATION
Wrap the signal cable & down-lead of sensor
Focation cone
Installation
Stand
Down-lead of sensor
Upper probe
Lower probe
Com probe
In the event of risk of electric
storms (lightning) or when liquid
medium in well or tank or sump
is very dirty it is recommended
float switch is used
(c) Liquid level probe installation
FLOAT SWITCH INSTALLATION
Upper level (ON)
Lower level (OFF)
If the float switch is equipped
with three wires use the BLACK
and BROWN wires. In event of
different colours use a multimeter
to identify correct connections
as follows:
Low level no reading OFF
Upper level-positive reading ON
(d) Float switch installation