Grundfos Dosing monitor Installation And Operating Instructions Manual Download Page 6

6

3. Mounting and setting of dosing 

monitor

1. Mount the monitor (the example below shows a 

monitor mounted on the suction side of the 
pump). The monitor must always be mounted 
vertically.

2. Connect the monitor to the pump level input.

3. Set the level input to "MONITOR".

Fig. 3 

4. Open the bypass valve.

5. Set the pump to operation at maximum capacity.

6. Prime the pump and the bypass channel.

7. Close the bypass valve and prime the floater 

channel.

8. Open the bypass valve and check that the pump 

is in alarm mode (the red indicator light is on).

9. Close the bypass valve gradually and adjust the 

contact screw until the floater jumps sufficiently 
and the pump changes over to normal operation 
(the red indicator light is off).

Fig. 4 

The function can be checked by letting air into the 
suction tube. This makes the pump change over to 
alarm mode (requires a certain counter pressure).

OK

T

M

02

 20

39

 33

01

Bypass 
channel

Bypass 
valve

Floater
Floater channel

Contact 
screw

Subject to alterations.

Reviews: