Start-up
39 | 72
BA_
T
D3
-A
M
0
0
1
e
n
_
0
1
4
_
M
X
A
.d
o
cx
6.2
Starting up the product
► Carry out the following steps after installation and after every maintenance.
1.
Set the time (refer to chapter 7.2.1).
2.
Set other operating parameters, if necessary (refer to chapter 7.2).
3.
Open the shut-off valves.
4.
Open the closest water withdrawal point downstream of the filter to the maximum.
5.
Apply the maximum operating pressure.
» The filter is vented.
6.
Check the filter for tightness.
7.
Carry out a backwash.
» The filter is in operation.
6.3
Handing over the product to the owner/user
► Explain to the owner/user how the product works.
► Use the manual to brief the owner/user and answer any questions.
► Inform the owner/user about the need for inspections and maintenance.
► Hand over all documents to the owner/user for keeping.
► Enter the initial start-up in the operation log (refer to chapter 12.1).