
Deferrisation
GENO-mat FE-Z Deferrisation System
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
34
Maintenance work required on the GENO-mat FE-Z deferrisation system
Checklist
Please enter measured values. Confirm checks with OK or enter repair work performed.
Maintenance performed (date)
Measured values
Water pressure [bar] upstream
and downstream of the system
Flow pressure [bar] upstream and
downstream of the system
Water meter reading [m³]
Iron inlet (measured)
Iron pure water (measured)
Inspections and checks of control unit and control valve
Release of backwash checked
Injector and sieve cleaned
Control valve checked for tight-
ness
Function of driving motor checked
System "regeneration and disinfection"
System treated with special gran-
ulate
Connections, hose connections, seals
Seals and hose connections
checked
Miscellaneous
Notes
Customer service technician
Company
Work time certificate (no.)
Signature