![Growing Spaces 42' GROWING DOME SNOWSHED DOORWAY Installation Manual Download Page 5](http://html1.mh-extra.com/html/growing-spaces/42-growing-dome-snowshed-doorway/42-growing-dome-snowshed-doorway_installation-manual_2270578005.webp)
42' Install Manual 6&11-W1 Snowshed Doorway Installation
Revised: 02/15/2022
Side Rafter Supports
Horizontal Glazing Support
Attach Horizontal Glazing Support just above
the Side Rafter Supports. Match the angle
of the Front Sloping Piece. Use 3" screws as shown.
7
8
9
Ensuring that it is level, place the Side Rafter Support at the mark from
Step 6. Mark and cut the angled end so that it is flush with the back
edge of the Front Sloping Piece. Attach Side Rafter Supports into Front
Sloping Piece, checking again for level. Use 2-1/2" screws as shown.
Headers
Using (2) 3" screws on each end, first screw the back Header
into the Side Rafter Supports. Check that the top door width opening
matches the bottom door width opening (between 37-3/4" and 38-1/4").
Secure the front Header to the back Header using (4) 2-1/2" screws along
the length of the Header. Secure Headers, Side Rafter Supports, and Door
Frames together using tie plates and joist hanger nails on both sides.
5 of 12