background image

GROWATT

 

NEW

 

ENERGY

 

CO

., 

LTD

No

.

12

 

Building,  Xicheng

 

Industrial

Zone, Bao’an

 

District, Shenzhen, P. R.China

 + 86 755 2747 1900
 + 86 755 2749 1460
 [email protected]

www.ginverter.com

T
F
E
W

Installation   
                       

Operation Manual

Growatt 3600MTL

Growatt 4200MTL

Growatt 5000MTL

GR - UM - 002 - 02

Summary of Contents for Growatt 3600 MTL

Page 1: ...ding Xicheng Industrial Zone Bao an District Shenzhen P R China 86 755 2747 1900 86 755 2749 1460 service ginverter com www ginverter com T F E W Installation Operation Manual Growatt 3600MTL Growatt...

Page 2: ...TION location 4 3 Fixed the mounting on the wall 4 4 Fixed the inverter on the wall 4 5 Check Ivewrter installation Status Electrical Connection 5 1 System Diagram with Inverter Electrical connection...

Page 3: ...of this device Qualified personnel are trained to deal with the dangers and hazards involved in installing electric devices Contact Display 6 1 LCD display 6 2 LCD control 6 3 Setting the LCD display...

Page 4: ...connected to a stand alone grid The energy generated is consumed directly on site surplus energy can be stored in batteries DC and AC Switch Separate the Growatt securely from the grid and the PV gen...

Page 5: ...ot remove the casing until at least 5 minutes after disconnecting all power sources This unit is designed to feed power to the public power grid utility only Do not connect this unit to an AC source o...

Page 6: ...on The installation method and mounting location must be suitable for the weight and dimensions of the inverter Select a wall or solid vertical surface that can support the PV Inverter Mount on a soli...

Page 7: ...connected it controls the current amplitude according to the PV Panel power supply Inverter always tries to convert the maximum power from your PV panel s Connection system This interface between Uti...

Page 8: ...orrect polarity connection could permanently damage the unit Check short circuit current of the PV string The total short circuit current of the PV string should be less than the inverter s maximum DC...

Page 9: ...and Germany is the second selection B Fig 5 5 1 Fig 5 5 2 When you need to select any of these countries you can Double knock to enter the next interface Here we select Italy as an example as Fig 5 5...

Page 10: ...6 1 LCD display Starting up display sequence once the PV power is sufficient inverter displays information as shown in the flow chart as follow Module xxxxxx SerNo xxxxxxxxxx FW Version x x x Connect...

Page 11: ...the display language luminance of the display auto test and frequency When the LCD is dark Knock and double knock make it becomes bright Knock to make it display next information or change the set si...

Page 12: ...ort click the Test button to start the auto test 18 19 1 Step flow is max voltage min voltage max frequency min frequency protection test 2 For each step the protection actives when the grid real valu...

Page 13: ...If the power is insufficient voltage 120VDC Inverter enters a waiting state Whilst waiting Inverter uses just enough power from the PV panel monitor internal system status In normal mode the LED is g...

Page 14: ...UNICATIONS 9 9 1 Communications software instructions ShineNET is a PC software that communicate with Shine Inverter to analyze the inverter working state It is convenient for you to know the inverter...

Page 15: ...connection cables 3 Check grid usability 24 25 SPECIFICATIONS 13 Input Data Max input current of the MPP tracker Max DC power Max DC voltage PV voltage range MPPT Full load voltage Initial feeding vol...

Page 16: ...510 188 24 KG Operating ambient temperature range 25 C 60 C 25 C 60 C 25 C 60 C Continuous full output power temperature range 25 C 50 C 25 C 50 C 25 C 50 C Protection degree IP 65 IP 65 IP 65 Outdoo...

Page 17: ...roduction loss of revenues are therefore specifically and without limitation excluded to the extent legally permissible GROWATT s aggregate liability if any in damages or otherwise shall not exceed th...

Page 18: ...ot cover transportation costs in connection with the return of defective modules The cost of the installation or reinstallation of the modules shall also be expressly excluded as are all other related...

Reviews: