background image

1

English

Safety notes

Avoid danger due to damaged external transformer 
connection cables. In the case of damage, the 
external transformer connection cable must be 
replaced by the manufacturer or his customer service 

department or an equally qualified person.
• Installation is only possible in frost-free rooms.
• The plug power supply is only suitable for indoor use.
• The plug-in connectors must 

not

 be directly or indirectly 

sprayed with water when cleaning.

• The voltage supply must be separately switchable.

Application

Can be used in conjunction with:
• pressurised storage heaters.
Use in conjunction with unpressurised storage heaters 
(displacement water heaters) is 

not

 possible.

Specifications

• Max. flow

       8.2 L/min or 2.2 gpm / 60 psi

• Flow pressure   

- min.                                       

7.25 psi

- recommended                         

14.5 - 72.5 psi

- greater than 72.5 psi, fit pressure 
  reducing valve

• Max. operating pressure                      

145 psi

• Test pressure                                

232 psi

• Temperature    

- max. (hot water inlet)                      

176 

°

F

• Voltage supply: 

120 V AC, 50/60 Hz

(plug power supply 120 V AC/6 V DC)

• Power consumption: 

9 VA

• Radio frequency: 

 

2.4332 GHz

• Transmitter power: 

 

< 0.05 mW

• Emergency voltage supply:  6 V lithium battery (type CR-P2)
• Operating panel battery: 3 V lithium battery (type CR 2032)
• Automatic safety shut-off (factory setting): 

60 sec.

• Type of protection: 

- Faucet 

IP 66

- Plug power supply  

IP 40

- Battery unit  

IP 66

- Operating panel  

IP 57

• Water connection

cold - RH

hot - LH

Note

Major pressure differences between hot and cold water supply 
should be avoided.

Electrical test data

• Software class: 

B

• Contamination class: 

2

• Rated surge voltage: 

2500 V

• Temperature for ball impact test: 

212 °F

The test for electromagnetic compatibility (interference 
emission test) was performed at the rated voltage 
and rated current.

Approval and conformity

This device complies with part 15 of the FCC Rules (USA) and 
with the RSS of the IC Rules (Canada).

Operation is subject to the following two conditions:

This device may not cause harmful interference, and this 
device must accept any interference received, including 
interference that may cause undesired operation.

Changes or modifications not expressly approved by the party 
responsible for compliance may void the user’s authority to 
operate the equipment.

Installation

Grease O-rings with the special grease supplied 
prior to installation.

Electrical installation

Electrical installation work must only 
be performed by a qualified electrician. This 
work must be carried out in accordance with 
the regulations according to IEC 364-7-701-1984 
(corresponding to VDE 0100 Part 701) as well 
as all national and local regulations.

Pre-assemble operating panel

, see fold-out page II, fig. [1].

Fit escutcheon and install function unit

, see figs. [2] 

and [3].

Install spout

,

 

see fig. [4].

Attach battery unit

,

 

see fig. [5].

Install operating panel

, see figs. [6] and [7].

Insert batteries with correct polarity.

Install pop-up drain (65 818)

, see fold-out page I, ensure that 

flange of pop-up drain is sealed.

Connect voltage supply

,

 

see fig. [9].

Settings during a power failure / when changing batteries

No settings saved by the user will be lost when changing the 
batteries or in the event of a power failure.

Flush piping system prior and after installation of faucet 
thoroughly! 

Summary of Contents for Ondus 36 084

Page 1: ...English 1 Fran ais 2 Espa ol 3 Design Quality Engineering GROHE Germany GROHE Ondus 36 084 96 696 031 M 213522 09 08 English 1 Fran ais 3 Espa ol 5...

Page 2: ...I S v p remettre cette instruction l utilisateur de la robinetterie Entregue estas instrucciones al usario final de la grifer a Please pass these instructions on to the end user of the faucet...

Page 3: ...II 2 5 6 16mm 10 9 7 8 8mm 2 5mm 4 1 3 2 1 A B C 13mm 11 3...

Page 4: ...class B Contamination class 2 Rated surge voltage 2500 V Temperature for ball impact test 212 F The test for electromagnetic compatibility interference emission test was performed at the rated voltag...

Page 5: ...ears after commissioning the fitting at the latest II Thermistor see Fig 11 1 Disconnect plug in connector A 2 Unscrew nut B and pull out thermistor C III Flow control 48 009 see fold out page I Insta...

Page 6: ...e logiciel B Degr de salissure 2 Surtension nominale 2500 V Temp rature de l essai de duret la bille 100 C Le contr le de la compatibilit lectromagn tique contr le des missions de parasites a t effect...

Page 7: ...e de la robinetterie II Capteur de temp rature voir fig 11 1 D brancher la fiche A 2 D visser l crou B et extraire le capteur de temp rature C III A rateur 48 009 voir volet I Le montage s effectue da...

Page 8: ...y del agua caliente Datos de comprobaci n el ctrica Clase de software B Clase de contaminaci n 2 Sobretensi n transitoria nominal 2500 V Temperatura del ensayo de dureza 212 F La comprobaci n de la co...

Page 9: ...rimera puesta en funcionamiento de la grifer a II Termosensor v ase la fig 11 1 Separar la conexi n de enchufe A 2 Desenroscar la tuerca B y retirar el termosensor C III Mousseur 48 009 v ase la p gin...

Page 10: ...ga Ontario Canada L5E 1E9 Technical Services Services Techniques Phone T l 905 271 2929 Fax T l copieur 905 271 9494 Grohe America Inc 241 Covington Drive Bloomingdale IL 60108 U S A Technical Service...

Reviews: