9
Installation
12. Thread the connection nipple (K) with
the O-ring seal and the stops into the
valve body outlet, see Fig. [9].
13. Place the scale ring (L) onto the chassis,
see Fig. [10].
14. Fix the scale ring (L) to the chassis with
washers (M) and screws (M1).
Do not
use excessive force to tighten
the screws (M1).
15. Push adjustable hot water limit stop (N)
to the intermediate handle (H) as de-
scribed in Fig. [11].
Please refer to chapter
"Maximum Hot
Water Limit Setting"
on page 11 for
limiting maximum outlet temperature.
16. Push the handle (O) on the intermediate
handle (H) so that the
"OFF"
position on
the scale ring is in alignment with the
arrow on the handle.
17. Tighten handle (O) with screw (O1) and
cover with cap (P).
The pressure balancing valve is now ready
for use.
9
K
12mm
L
10
M
M1
11
H
O1
O
P
N
Summary of Contents for Grohsafe 35 237
Page 3: ...II Spare Parts 3 4 Spare Parts Spare Parts...
Page 13: ...14...