![Groen TDHC Series Operator'S Manual Download Page 8](http://html1.mh-extra.com/html/groen/tdhc-series/tdhc-series_operators-manual_2268422008.webp)
OM-TDH/C
7
Make sure that the open end of the elbow on the
pressure safety valve is directed downward.
Water Treatment
in the Maintenance section of this
3.
Make sure the supplies of gas and electric
manual.
11. Check to be sure that the open end of the elbow on
the outlet of the safety valve is directed downward.
in the Operation section of this manual. Begin
Be sure to read and follow the instructions on the
heating the water at the highest thermostat
attached safety valve tag.
setting. The indicator light should come on and
B. Initial Start-Up
IMPORTANT:
BE SURE ALL OPERATORS READ, UNDERSTAND
AND FOLLOW THE OPERATING INSTRUCTIONS,
CAUTIONS, AND SAFETY INSTRUCTIONS
CONTAINED IN THIS MANUAL.
After the kettle has been installed, the installer should
test to ensure that it is operating correctly.
1.
Remove literature and packing materials from
inside and outside of the unit.
2.
Put on or two inches of water into the kettle.
power are on.
4.
Follow the
“To Start Kettle Heating”
instructions
heating should continue until the water boils.
5.
To turn off the unit, follow “To Stop Kettle
Heating” in the
Operation
Section of this manul..
If the kettle functions as described, it is ready for
use. If the unit does not operate as designed,
contact authorized Groen Service Agent.
WARNING
DO NOT STAND ON OR APPLY UNNECESSARY WEIGHT OR PRESSURE ON THE KETTLE FRONT OR
POURING LIP. THIS COULD RESULT IN THE OVERLOAD AND FAILURE OF THE TILT MECHANISM, AND
POSSIBLE SERIOUS INJURY AND BURNS TO THE OPERATOR AND OTHERS.
Summary of Contents for TDHC Series
Page 21: ...OM TDH C 20 Schematic...