![Grip G-MEK-PM Assembly And Operating Manual Download Page 4](http://html1.mh-extra.com/html/grip/g-mek-pm/g-mek-pm_assembly-and-operating-manual_2265635004.webp)
G-MEK-PM
Assembly and Operating Manual
7 Maintenance and care
The O-rings (pos. 6 and 8) should be slightly lubricated.
7.1 Disassembly of the MEK
(See Image 2)
1.
Remove all compressed air lines.
2.
Loosen the mounting screws (pos. 9, 10 and 14).
3.
Remove the electric covers (pos. 3).
4.
Remove the distance bushings and the O-rings (pos. 5 and 8).
5.
Clean all parts thoroughly. Inspect for wear and defects.
6.
Lubricate all mating surfaces.
7.
Replace all seals.
For assembly, reverse the order.
7.2 Torque specifications
M2,5 – 0,5 Nm; M3 – 1,0 Nm; M4 – 2,0 Nm; M5 – 4,0 Nm
7.3 Compressed air connection
Requirements for compressed air according to ISO 8573-1: 6 4 4.
8 Parts List
8.1 Spare and wear parts, depending on size
Rev. 1.02
4
1
Description
Upper assembly
Lower assembly
Electric cover
Distance bushing
O-ring
Strain relief
O-ring
EG-MEK-IKS..
Socket head screw
Countersunk head screw
Electrical bushing
Order-No.
1
Insulation body with pins
Description
4
4
Pos.
2
Quantity
EG-MEK-OR..x.
EG-MEK-IK..
1
1
Pos.
1
2
2
12
O-ring
Insulation body with bushings
1
11
1
2
2
6
7
8
5
6
1
2
3
12
13
15
9
10
11
14
2
4
optional
Electrical plug
Cylindrical pin
Mounting screw
Cable
Quantity