English
Page 8
Grind ’n Brew Coffee Systems
CONTROL BOARD SETTINGS
J1
Jumper should remain on pin 1 & 2
J2
Jumper Controls
-No pin connected with jumper-No minimum brewing temperature
-Jumper connecting 2 & 3 - Low temperature no brew. The brewing cycle with wait
until
temperature of water is ready before continuing
(factory setting)
-Jumper connecting 1 & 2 - Disables thermister, unit must use a thermostat to operate
properly (not normally used)
Number 1 pins
Jumper J1
Jumper J2
Summary of Contents for 10
Page 2: ......
Page 10: ...Page 9 Grind n Brew Coffee Systems English 185ÞF 85ÞC oz 100 grams of coffee ...
Page 12: ...English Page 11 Grind n Brew Coffee Systems ...
Page 13: ...English Page 12 Grind n Brew Coffee Systems ...
Page 14: ...Page 13 Grind n Brew Coffee Systems English ...