![Grill'D Aurora 180 Long Operation Manual Download Page 8](http://html1.mh-extra.com/html/grilld/aurora-180-long/aurora-180-long_operation-manual_2265061008.webp)
8
1
2
Fig. 6
5.2. Door
It is necessary to perform the following actions to install the door (refer to
Figure 6):
1)
Choose the door opening direction and mount the door onto the seat;
2)
Fix it in this position via the metal pin.
5.3. Ash drawer
Place of installation and installation method for the ash drawer are shown in
Figure 7.
5.4. Combustion chamber reinforcement
It is necessary to perform the following actions to install reinforcement plates
(refer to Figure 8):
1)
Install the back plate with a convex part to the wall of the firebox. The upper
part of the plate shall rest on the firebox wall, while the lower part shall be
spaced 5-10 mm from it;
2)
Install side plates one by one (the order of installation is of no importance).
1
1
2
2
Fig. 8
Fig. 7