![Grill'D Aurora 180 Long Operation Manual Download Page 10](http://html1.mh-extra.com/html/grilld/aurora-180-long/aurora-180-long_operation-manual_2265061010.webp)
10
Compound for metal protection and volatile components of the heat-
resistant enamel evaporate as a result of stoking.
Note:
Heat-resistant enamel can change tone on the most thermally loaded
elements of the heater, which is not a manufacturing defect.
IMPORTANT! Avoid the chance of mechanical impact and ingress of water
on the paint coating of the heater during preparatory stoking.
IMPORTANT! Carry out the heater installation and laying of the stones only
after the complete cooldown of the heater.
IMPORTANT! Installation of the heater, chimney, and water tank shall be
carried out in accordance with SNiP 41-01-2003 (Construction Standards and
Regulations) and by competent employees of a specialized construction and
installation company only.
Procedure for the heater and chimney installation:
1)
Prepare the room and the place of the heater permanent operation taking
into account the requirements of SNiP 41-01-2003.
2)
Install the heater on the specified place in compliance with the
requirements of SNiP 41-01-2003.
3)
Perform the installation of the heater parts in accordance with Section 5 of
this Manual.
4)
Put the stones into the stone heater.
Note:
While laying the stones, It is necessary to ensure that they are as large
as possible and that they fit closely to the entire surface of the stone heater.
It is safer and more appropriate to use special stones, such as talcum peach,
gabbro diabase, jade and others, intended for use in a bath house.
IMPORTANT! It is prohibited to use halite to fill stone heaters.
5)
Install the chimney.
6)
Make sure that all heater elements and chimney system modules function
normally (without firing the heater), and also make sure that the following
faults and discrepancies are absent:
- Missing parts;
- Visible damage of the heater body, parts;
- Ash drawer moves with difficulty.
IMPORTANT! It is prohibited to operate faulty heaters and chimneys.
IMPORTANT! The heater connection with the chimney or other structures
shall be dismountable.
IMPORTANT! For a better sealing of chimney modules with one another,
it is compulsory to use a high-temperature sealant with an operating
temperature of at least 1000
⁰С.