background image

 

11. 

Install the APE unit, using the M4 screws, spacers and fibre washers provided. The two longer M4 screws go through into 

 

the gearbox and the single shorter screw only goes into the plastic housing. 

 

 

 

 

 

 

 

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
The bottom of the APE assembly must be held in position (as shown above) while fastening all three M4 screws. This will provide a 
neat mesh between the shaft drive gear and small APE gear (shown below). 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
It is important that the teeth are not too far apart as shown below. 

Drive gear 

APE gear 

Long screw 

Short screw 

Summary of Contents for eDrive 2.0 M123ED2

Page 1: ...0 label for controller eDrive 2 0 label for limit enclosure For accessory compatibility and set up please refer to page 18 20 of the eDrive 2 0 manual included in package INSTALLATION 1 Power off 2 Re...

Page 2: ...r on 5 Remove OE assembly including cable no longer needed 6 Detach OE wheel no longer needed use pliers or small blade screwdriver Remove the OE enclosure observe correct orientation of the enclosure...

Page 3: ...rovided M4 hex head taptites to drive in and out of the holes shown below There should be a clearance of approx 1mm between the base of the enclosure and the hex head to ensure adequate thread depth h...

Page 4: ...ter screw only goes into the plastic housing The bottom of the APE assembly must be held in position as shown above while fastening all three M4 screws This will provide a neat mesh between the shaft...

Page 5: ...foul on any of the APE gears 13 Refit enclosure cover 14 Replace MCB Main Control Board and connect APE cable to eDrive 2 0 MCB then guide the excess cable between the MCB top of the enclosure 15 Pla...

Page 6: ...terminals are slightly different to the Maestro MK1 3 specifically the Y Z terminals have been alternated refer below This must be recognised when converting a single phase Maestro opener MK1 3 eDriv...

Page 7: ...7 15 If an EB Expansion Board is fitted the battery on the EB must be removed It is recommended that pliers be used as shown below...

Page 8: ...bomb limits Hold stop and press set 3 times limit LED should begin to flash Press set limit LED will flicker Run door open for less than 2 seconds then press set limit LED should become solid Cycle po...

Reviews: