background image

MODEL GA03  

USER INSTRUCTION MANUAL

FOR MATERIALS HANDLING

Summary of Contents for GA03

Page 1: ...MODEL GA03 USER INSTRUCTION MANUAL FOR MATERIALS HANDLING ...

Page 2: ...ll place no more load than would otherwise be directed under traffic conditions or if using alternative means of access such as rope access systems WARNING This product is part of a hauling system for materials handling The user must follow the manufacturer s instructions for each component of the system These instructions must be provided to the user of this equipment The user must read and under...

Page 3: ...t should be undertaken prior to installing any GMA product The Gridmesh Anchor and any attaching hauling systems must be positioned in a way that reduces the risk of a load colliding or impacting them in the event of a fall For example protrusions sharp edges machinery or other items that may be located in the area a fall may occur should be cleared or precautions taken to prevent collision prior ...

Page 4: ... 300PFC 300PFC 300PFC 380PFC 380PFC 380PFC Un equal angle Rectangular hollow section 250 x 150 x 6 250 x 150 x 6 250 x 150 x 6 250 x 150 x 6 250 x 150 x 6 250 x 150 x 6 250 x 150 x 6 Square hollow section 250 X 6 250 X 6 250 X 6 Minimum required beam size for SIMPLY SUPPORTED structure Minimum required beam size for SIMPLY CANTILEVERED structure Safe Load Calculator Platform structure dimensions f...

Page 5: ... structures where there is high wind ocean swell or moving equipment it may be appropriate to secure the GMA to the structure with rope cable ties maillons or another appropriate fastening to prevent the GMA from moving LOAD ZONE LOAD ZONE 4 Open the GMA lid and remove the rope tag line wire sling and support beam Connect the end of the sling to the rope tag line 5 Align the GMA such that the loca...

Page 6: ...ere is sufficient load line chain available to be connected to the load once the device is raised into position 8 Haul the sling with chainblock block tackle attached by pulling the rope back through the gridmesh such that the end of the sling protrudes through the gridmesh and the base of the GMA 9 Slide the GMA beam end through the sling and slide into position in the base such that the beam can...

Page 7: ...our safety before using the Gridmesh Anchor Read and understand all manufacturers instructions for each component of the hauling system All sub systems are supplied with separate user instructions Keep all instructions for future reference Review Section 1 2 and Section 2 0 to ensure system limitations and other requirements have been met Review applicable information regarding system clearance cr...

Page 8: ...r wear that may affect strength and operation function 2 Inspect the base and lid portions of the Gridmesh Anchor ensuring there are no breaks cut wear or damage and that labels are present Reflective tape can be replaced if missing 3 Inspect the Gridmesh Anchor beam surface finish for corrosion and impact damage ensuring the end caps are not loose and the labels are legible and present 4 Inspect ...

Page 9: ...e product issue along with the original proof of purchase to GRIDMESH ANCHOR PO Box 899 LANE COVE NSW 2066 Email quality gridmeshanchor com The End User must pay the cost of packaging and returning the product to Gridmesh Anchor Limitation of Warranty The warranties stated in this document are exclusive and are made in place of any and all conditions warranties or representations as to the merchan...

Page 10: ...MODEL GA03 USER INSTRUCTION MANUAL FOR MATERIALS HANDLING ...

Page 11: ...ll place no more load than would otherwise be directed under traffic conditions or if using alternative means of access such as rope access systems WARNING This product is part of a hauling system for materials handling The user must follow the manufacturer s instructions for each component of the system These instructions must be provided to the user of this equipment The user must read and under...

Page 12: ...t should be undertaken prior to installing any GMA product The Gridmesh Anchor and any attaching hauling systems must be positioned in a way that reduces the risk of a load colliding or impacting them in the event of a fall For example protrusions sharp edges machinery or other items that may be located in the area a fall may occur should be cleared or precautions taken to prevent collision prior ...

Page 13: ... 300PFC 300PFC 300PFC 380PFC 380PFC 380PFC Un equal angle Rectangular hollow section 250 x 150 x 6 250 x 150 x 6 250 x 150 x 6 250 x 150 x 6 250 x 150 x 6 250 x 150 x 6 250 x 150 x 6 Square hollow section 250 X 6 250 X 6 250 X 6 Minimum required beam size for SIMPLY SUPPORTED structure Minimum required beam size for SIMPLY CANTILEVERED structure Safe Load Calculator Platform structure dimensions f...

Page 14: ... structures where there is high wind ocean swell or moving equipment it may be appropriate to secure the GMA to the structure with rope cable ties maillons or another appropriate fastening to prevent the GMA from moving LOAD ZONE LOAD ZONE 4 Open the GMA lid and remove the rope tag line wire sling and support beam Connect the end of the sling to the rope tag line 5 Align the GMA such that the loca...

Page 15: ...ere is sufficient load line chain available to be connected to the load once the device is raised into position 8 Haul the sling with chainblock block tackle attached by pulling the rope back through the gridmesh such that the end of the sling protrudes through the gridmesh and the base of the GMA 9 Slide the GMA beam end through the sling and slide into position in the base such that the beam can...

Page 16: ...our safety before using the Gridmesh Anchor Read and understand all manufacturers instructions for each component of the hauling system All sub systems are supplied with separate user instructions Keep all instructions for future reference Review Section 1 2 and Section 2 0 to ensure system limitations and other requirements have been met Review applicable information regarding system clearance cr...

Page 17: ...r wear that may affect strength and operation function 2 Inspect the base and lid portions of the Gridmesh Anchor ensuring there are no breaks cut wear or damage and that labels are present Reflective tape can be replaced if missing 3 Inspect the Gridmesh Anchor beam surface finish for corrosion and impact damage ensuring the end caps are not loose and the labels are legible and present 4 Inspect ...

Page 18: ...e product issue along with the original proof of purchase to GRIDMESH ANCHOR PO Box 899 LANE COVE NSW 2066 Email quality gridmeshanchor com The End User must pay the cost of packaging and returning the product to Gridmesh Anchor Limitation of Warranty The warranties stated in this document are exclusive and are made in place of any and all conditions warranties or representations as to the merchan...

Reviews: