INTRODUCTION
The CR3 Series Cleanroom Monitor was developed specifically
to allow for monitoring of confined spaces with accuracy and
reliability.
The CR3C features analog inputs for connecting remote sensors
for monitoring temperature, humidity and pressure (remote
sensors not included). The CR3C is available with output signal
of either Analog, BACnet ® or Modbus. Standard features include
adjustable alarm relays for each parameter, audible/visual alarms,
and large LED displays.
The CR3C is housed in a flush fitting stainless-steel front plate that
enables the user to wipe down the unit when necessary.
Figure 1
Figure 2
Figure 3
Figure 1
Figure 2
Figure 3
BEFORE INSTALLATION
Read these instructions carefully before installing and commissioning the cleanroom monitor. Failure
to follow these instructions may result in product damage. Do not use in an explosive or hazardous
environment, with combustible or flammable gases, as a safety or emergency stop device or in any
other application where failure of the product could result in personal injury. Take electrostatic discharge
precautions during installation and do not exceed the device ratings.
MOUNTING
STEP 1
- As illustrated in Figure 1, unscrew four screws
from faceplate, set screws aside, and remove faceplate
from mounting bracket.
Cut hole in wall 210 mm x 167 mm
high. Ensure unit can be secured to
wall stud or equivalent on at least
two sides.
STEP 2
- As illustrated in Figure 2, feed wires through
mounting bracket and conduit connector/cable gland and
secure.
STEP3
- As illustrated in Figure 3, insert mounting bracket
into
hole in wall.
210 mm
167 mm
IN-CR3
CXXANA-01 04
/20
Copyright © Greystone Energy Systems, Inc. All Rights Reserved Phone: +1 506 853 3057 Web: www.greystoneenergy.com
CLEANROOM MONITOR
CR3C Analog - Installation Instructions