05.2012
6
Tetra
Subject to technical modifications
5.0 Loading ...........................................................................................................33
6.0 Preparations ...................................................................................................35
6.1
Checking requirements for the tractor ..........................................................................35
6.2
Ballast weight ...............................................................................................................35
6.3
Adjusting the track width of the wheel mark eradicator (additional equipment) ............36
7.0 Coupling the implement ................................................................................37
7.1
Coupling the bottom links ..............................................................................................37
7.2
Coupling the top link .....................................................................................................38
7.3
Install the cable for releasing the side arm locking on Tetra 7500 L, 9000 L ................39
7.4
Connecting lighting (additional equipment) ...................................................................39
7.5
Connecting hydraulic lines - Folding cylinder and additional equipment ......................40
7.5.1 Required hydraulic connections ........................................................................40
7.5.2 Connecting hydraulic lines ................................................................................41
7.6
Insert the supports ........................................................................................................42
8.0 Travelling by road...........................................................................................43
8.1
Transport instructions ....................................................................................................43
8.2
Machine identification / lighting .....................................................................................44
8.3
Preparations for travelling by road ................................................................................45
8.4
Travelling by road ..........................................................................................................45
9.0 Working in the field
........................................................................................46
9.1
Safety during operation .................................................................................................46
9.2
Working speed .............................................................................................................46
9.3
Preparations in the field ................................................................................................46
9.4
Fold machine out into working position .........................................................................47
9.5
Adjust the working depth of the tine fields ....................................................................48
9.6
Adjust the height of the tine trailer ................................................................................49
9.6.1 Tine trailer .........................................................................................................49
9.6.2 Hydraulic tine trailer (additional equipment) .....................................................50
9.7
Adjusting the working depth of the wheel mark eradicator (additional equipment) .......51
9.8
Adjust the height of the support wheels - Tetra 7500 L, 9000 L ....................................52
9.9
Working information ......................................................................................................52
9.10 Adjustments during operation .......................................................................................52
9.11 Remove wall of earth in front of tine trailer ...................................................................53
9.12 Rectifying blockages .....................................................................................................53
10.0 After working - fold in the implement ...........................................................54
10.1 Preparations for folding in the implement .....................................................................54
10.2 Folding the Tetra to the transport position .....................................................................55
11.0 Set implement down and uncouple ..............................................................57
11.1 Note the following before setting down .........................................................................57
11.2 Pull out the set-down supports and lower the implement .............................................58
11.3 Separating hydraulic connections - Folding cylinder and additional equipment ...........59
11.4 Separating lighting (additional equipment) ....................................................................59
11.5 Uncoupling the top link ..................................................................................................60
11.6 Uncoupling the bottom links ..........................................................................................60
Contents
Summary of Contents for Tetra 3001 L
Page 4: ...05 2012 4 Tetra Subject to technical modifications ...
Page 104: ......
Page 106: ......
Page 107: ...107 05 2012 Tetra Subject to technical modifications 21 0 EU Declaration of Conformity ...
Page 108: ......
Page 110: ......
Page 111: ......