MAINTENANCE
REPLACING THE IMPELLER
(See Figure 12)
W A R N I N G
Make sure to turn off the bail lever and remove the battery pack(s) before performing any
maintenance task on your snow thrower.
• Remove the 4 sets of nuts and bolts on the middle steel plate.
• Remove the 4 sets of nuts and bolts on each side.
• Remove the impellers (1).
• Install the new impellers.
• Tigthen the 8 sets of nuts anf bolts that you removed.
4 sets of bolts nd nuts on each side
(total of 8 sets)
4 sets of nuts and bolts on the middle
steel plate
Fig. 12
24
1
Summary of Contents for GN 220
Page 2: ......
Page 32: ...TOLL FREE HELPLINE 1 855 470 4267 Greenworks Tools PO Box 1238 Mooresville NC 28115...
Page 63: ...LIGNE D ASSISTANCE SANS FRAIS 1 855 470 4267 Greenworks Tools PO Box 1238 Mooresville NC 28115...
Page 94: ......
Page 95: ......
Page 96: ...L NEA DE AYUDA GRATUITA 1 855 470 4267 Greenworks Tools PO Box 1238 Mooresville NC 28115...