GreenFlux Dual Socket Smart Charging Controller
page - 14 -
©GreenFlux Assets B.V.
–
All rights reserved.
Installation Manual; version 4.6; 2019-11-05
Doc.nr. GFX.2017.14201807
“
InversedServo
” the signaling behavior can be adjusted to match
the desired detection condition.
Both, two-stage and three-stage servo lock actuators are
supported. Please refer to the
GreenFlux Smart Charging
controller Configuration Manual
. With the configuration item
“
3StageServo
” the correct servo lock type can be selected.
If a charging station uses tethered cables, the servo lock signals
must not be used/connected.
2.7.2
SOCKET 2
Pin 1 up to 12 must be used for controlling socket 2:
PIN
CONNECTION
INFO
1
PP (proximity pilot / plug presence)
Charge cable type detection
2
CP (control pilot)
Communication with (PH)EV
3
Temperature
Temperature sensor connection
4
Ground
Use with temperature sensor or
attached cable model
5
LED red
Status LED of socket for user
6
LED green
Status LED of socket for user
7
LED blue
Status LED of socket for user
8
S0+ or RS485P
Measuring of charging (PH)EV
9
S0- or RS485N
Measuring of charging (PH)EV
10
Servo control
Servo pin 1 (must remain
unconnected when outlet is a
tethered cable)
11
Servo control
Servo pin 2 (must remain
unconnected when outlet is a
tethered cable)
12
Servo control
Servo pin 3 (must remain
unconnected when outlet is a
tethered cable)
When choosing a fixed cable setup, a PP-resistor with the
correct cable value (IEC 61851-1 Ed. 2.0) must be connected
between pin 1 and 4 for socket 2.
Resistor value
Current capability of the cable assembly
1,5 kΩ 0.5 W
13 A
680 Ω 0.5 W
20 A
220 Ω
0.5 W
32 A
100 Ω 0.5 W
63 A (3 phase) / 70 A (1 phase)
For a 1-phase charging station configuration, the usage of an S0
meter is possible (though not recommended). For a 3-phase
charging station configuration only an RS485 meter should be
used.