background image

greenfan® bipolar ionizer Model 1600-01

 

© 2022 greenfan® inc. 

installation. Do not connect electrical power until installation is completed. 

b)  For ventilation fan, install greenfan® bipolar ionizer behind protective grill of fan on a 

22-gauge sheet metal support (supplied by installer) attached to a vertical bracket 
holding fan motor with two self-tapping screws (1/4" drive x ¾" long) attached 
through holes in flanges on either side of unit with at least one inch clearance 
between carbon fiber electrodes and metal surfaces to ensure airflow over both 
electrodes as shown in 

Figure 12

. Make sure any wires secured with zip ties and 

located more than one inch away from greenfan® bipolar ionizer carbon fiber 
electrode brushes. Make sure screws do not interfere with wires or fan blade 
movement. Manually rotate fan blade after installation to verify screws do not 
interfere with fan rotation. 

c)  After completing all steps of mechanical installation proceed to electrical installation. 

 

 

Figure 12. Bipolar ionizer installed at inlet of ventilation fan behind protective grill 

 

6.2 Ventilation Fan Electrical Operation 

a)  Ventilation fan electrical installation requires UL-listed 120/24VAC transformer 

(Model 1602-01). Use multimeter to locate 120VAC wire to fan motor and use in-line 
splices to connect 120/24VAC transformer wire to 120VAC fan motor wire and 
120/24VAC transformer common to 120VAC neutral wire shown in 

Figure 11

b)  Connect greenfan® bipolar ionizer blue wire to one wire of 24VAC transformer and 

connect greenfan® bipolar ionizer black wire to other wire of 24VAC transformer. 

c)  Install wire nut to insulate unused white wire of greenfan® bipolar ionizer. 
d)  The greenfan® bipolar ionizer will draw less than 130mA and 1.6W or greater at 

24VAC and 50/60 Hz when energized when ventilation fan is turned on. 

e)  After completing all steps of mechanical and electrical installation proceed to 

ventilation fan verification of proper operation. 
 

Summary of Contents for 1600-01

Page 1: ...odel 1600 01 INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS Intertek Verified Zero Ozone Meets UL 2998 CARB Certified Certified to CSA C22 2 187 Conforms to UL 867 LAB TESTED US Patent 11173226 a...

Page 2: ...Fan Verification of Proper Operation 7 5 0 AIR PURIFIER INSTALLATION 7 5 1 Air Purifier Mechanical Installation 7 5 2 Air Purifier Electrical Installation 7 5 3 Air Purifier Verification of Proper Ope...

Page 3: ...e Weighted Average TWA ozone for this product is 0 0 parts per million by volume ppmv when tested in a 30 m3 chamber The product is CARB certified and meets the Intertek Sustainability Verified Zero O...

Page 4: ...lar ionizer NOTICE The greenfan bipolar ionizer should only be installed and used as directed in this installation manual or the 2 page tri fold manual supplied with the product Please read the entire...

Page 5: ...For air purifiers or ventilation fans disconnect power or unplug power cord before installation All field wiring must be in accordance with the National Electrical Code NEC or National Fire Protection...

Page 6: ...polar ionizer installation at fan inlet of an HVAC system f Install bipolar ionizer on metal shroud and with at least one inch clearance between electrodes and metal surfaces Make sure screws do not i...

Page 7: ...VAC control signal wires install 120 208 240V to 24VAC Class 2 UL listed transformer Model 1601 01 shown in Figure 8 and Figure 9 Connect 120 208 240V common wire of transformer to 120 208 240V common...

Page 8: ...eenfan bipolar ionizer Model 1600 01 2022 greenfan inc 6 Figure 8 Bipolar ionizer installed with 120 208 240V to 24VAC transformer Figure 9 Installation schematic with 120 208 240V to 24VAC transforme...

Page 9: ...hrough holes in flanges on either side of unit with at least one inch clearance between carbon fiber electrodes and metal surfaces to ensure airflow over both electrodes Install greenfan bipolar ioniz...

Page 10: ...nergized or turned on e After completing all steps of the air purifier mechanical and electrical installation proceed to air purifier verification of proper operation 5 3 Air Purifier Verification of...

Page 11: ...th fan rotation c After completing all steps of mechanical installation proceed to electrical installation Figure 12 Bipolar ionizer installed at inlet of ventilation fan behind protective grill 6 2 V...

Page 12: ...usly illuminated when thermostat fan switch air purifier or fan is turned to the ON position then bipolar ionizer is operating properly The greenfan bipolar ionizer continuously monitors high voltage...

Page 13: ...lity Verified Zero Ozone This product meets UL 2998 and does not emit more than 0 005 ppm as tested per UL 867 d CAUTION HIGH VOLTAGE This equipment should be inspected frequently and collected dirt r...

Page 14: ...oduct at the time of original purchase and GREENFAN shall not be liable for any direct indirect consequential or incidental damages arising out of the use or inability to use the product An RMA is req...

Page 15: ...5 x 104 TCID50 ml achieving a 97 6 reduction within 60 minutes 74 5 reduction within 30 minutes and 45 reduction within 15 minutes when installed on the inlet of a blower fan circulating air in a 20 x...

Reviews:

Related manuals for 1600-01