5
Prior to every transport make sure that the oil is drained.
Storage
Short-term Storage
Version with gas ballast device with ball-cock:
Make sure that the ball-cock of the gas ballast (440) device is closed
Storage of vacuum pump equipped with ball-cock of the gas ballast
(440) and paper filter (applicable to 1RV0063 and 1RV0100):
Seal the paper filter of gas ballast (440) with tapes:
Storage of vacuum pump equipped with ball-cock of the gas ballast
(440) and sintered metal filter (applicable to 1RV0020 and 1RV0040):
Seal the sintered metal filter of gas ballast (440) with tapes:
Make sure that the suction connection/gas inlet and the gas
discharge/ pressure connection are closed
Store the vacuum pump
— if possible in original packaging,
— indoors,
— dry,
— dust free
— vibration free
Conservation
In case of adverse ambient conditions (e.g. aggressive atmosphere,
frequent temperature changes) conserve the vacuum pump immediately. In
case of favorable ambient conditions conserve the vacuum pump if a
storage of more than 3 months is scheduled.
During the factory tests, the vacuum pump inside has been completely in
contact with oil. In case of favorable ambient conditions, it is not necessary
to the pump with conservation oil. In case of unfavorable storage conditions,
the vacuum pump draining with conservation oil is advised. If anything
remains to be clarified please contact your Greenco representative!
Storage of vacuum pump with gas ballast (440) of ball-cock:
Make sure that the ball-cock of the gas ballast device (440) is closed
Storage of vacuum pump with gas ballast (440) of ball-cock and paper filter:
Seal the paper filter of gas ballast (440) with tapes;
Storage of vacuum pump with gas ballast (440) of ball-cock and sintered
metal filter;
Seal the sintered metal filter of gas ballast (440) with tapes;
Make sure all openings are sealed; seal all the openings not
protected with PTEF tape, washer or O-rings.
Fill in conservation oil in small quantities by the suction connection,
observe the oil type and the given quantity in the tables below:
Oil Type
Corex HLP-D 68, P/N 0831 512 575
(or a conservation oil from same quality)
NOTE:
VCI stands for “Volatile Corrosion Inhibitor”. VCI-products (film,
paper, cardboard, foam) evaporate a substance that condenses in
molecular thickness on the packed good and by its electro-chemical
properties effectively suppresses corrosion on metallic surfaces. However,
VCI-products may attack the surfaces of plastics and elastomers. Seek
advice from your local packaging dealer! GREENCO uses CORTEC VCI
126 R film for the overseas packaging of large equipment.
Wrap the vacuum pump in VCI film.
Store the vacuum pump.
if possible in original packing
indoors
dry
dust free
vibration free
Commissioning after conservation
Make sure that the gasket, plug or adhesive tape are removed from the
ports.
Commission the vacuum pump as described in the chapter “Installation
and Commissioning” (Page 5).
Installation and Commissioning
Installation prerequisites
Make sure that the assembly of the vacuum pump is carried out in line
with the essential safety requirements.
Mounting Position and space
Make sure that the environment of the vacuum pump is not potentially
explosive.
Make sure that the following ambient conditions will be complied
with
:
—
Ambient temperature: see “Oil”
If the vacuum pump is installed in a environment of low temperature:
—
Ambient pressure: atmospheric pressure
Fit the vacuum pump either with an oil sump heater (on request) or
fit the vacuum pump with a temperature switch and control the vacuum
pump in such a way that it will start automatically when the oil sump
CAUTION
Tilting a vacuum pump that is already filled with oil can cause large
quantities of oil to ingress into the cylinder.
Starting the vacuum pump with excessive quantities of oil in the
cylinder will immediately break the vanes and ruin the vacuum
pump.
Once the vacuum pump is filled with oil it shall not be lifted
anymore.
CAUTION
In case of non-compliance with the installation prerequisites,
particularly in case of insufficient cooling:
Risk of damage or destruction of the vacuum pump and adjoining
plant components!
Risk of injury!
The installation prerequisites must be complied with.